Wiring Instructions
Installation Manual
44
Communication and I/O Wiring
Lead the wires with 15-pin, 6-pin and 3-pin connectors prepared for communication and I/O connection
through the front square hole of the unit base and through the wire glands in front of the DC cable
glands.
Plug these connectors into the relevant connector bases built-in at the inner side wall of the cabinet
adjacent to the DC terminals as the following figure:
Figure 44.
Communication and I/O Connection Location
15-pin Connector
(CNJ3)
2-pin Connector
(CNJ5)
6-pin Connector
(CNJ13)
RJ45 Connector
(CNJ11, CNJ12)
3-pin Connector
(CNJ7)
J BD
Содержание 100kW PCS
Страница 1: ...100kW Power Conditioning System PCS Installation Manual Version 1 0 0...
Страница 3: ...Installation Manual ii Warranty 60 Appendix 61 Specifications 61 Glossary 63 Screw Torque Table 65...
Страница 26: ...Installation Installation Manual 22 12 Repeat for the rear panel Figure 20 Closing a Rear Panel...
Страница 38: ...Installation Installation Manual 34 3 Repeat for the rear panel Figure 35 Closing a Rear Panel...