background image

 

 

 

 

ELP AM Series - Manual 2011 - 042011 

Copyright Delta UV 

©

 

 

Page 1

 

 

 

 

 

ELP AMALGAM RANGE 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

INSTALLATION AND MAINTENANCE 

MANUAL 

 

 

Содержание ELP1016/3AM

Страница 1: ...ELP AM Series Manual 2011 042011 Copyright Delta UV Page 1 ELP AMALGAM RANGE INSTALLATION AND MAINTENANCE MANUAL ...

Страница 2: ...nts including Title 21 Chapter 1 Subchapter J pertaining to radiological health All Delta UV systems are sized to match the maximum flow rate of the circulation pump s Proper installation calls for 100 of the circulation system flow to pass through the UV reactor Slip stream or bypass installations which direct only a portion of the recirculation flow to pass through the UV reactor cannot be guara...

Страница 3: ...hould always be followed including the following 1 READ AND FOLLOW ALL INSTRUCTIONS 2 WARNING A wire connector is provided on this unit to connect a minimum 8 AWG 8 4 mm2 solid copper conductor between this unit and any metal equipment metal enclosures of electrical equipment metal water pipe or conduit within 5 feet 1 5 m of the unit 3 WARNING For indoor use only This unit is not intended for out...

Страница 4: ...orn or damaged In this case it should be replaced 6 WARNING If the connecting cable between the reactor and the electrical cabinet is damaged it must be replaced by a special cable available as a spare part 7 WARNING Even when stopped power is present in the electrical unit so make sure that the main power supply upstream of the electrical cabinet is switched off before carrying out any work on th...

Страница 5: ...tion where the lamp can be taken out the AVAILABLE HEIGHT should be DOUBLE the total height of the appliance The reactor must be installed after the filter s Keep any sources of hydrochloric acid vapours away from the installation Maximum cable length between the UV reactor and the electrical unit is 3 meters Before accessing the connection terminals ensure that all supply circuits are disconnecte...

Страница 6: ...Page 6 TABLE OF CONTENTS Pages A TECHNICAL SPECIFICATION 8 B INSTALLATION INSTRUCTION 10 C STARTING UP 13 D USE 14 E MAINTENANCE 16 F TROUBLESHOOTING 22 G ALARM CONTACT 22 ANNEX 1 Clearance dimensions Blown up view Designation ANNEX 2 Electrical diagrams ...

Страница 7: ...truction Manual Icon Identification To aid the reader in understanding the importance of various items contained within this manual Icons are used to throughout this manual to identify the area of importance of the selected item The five icons used and their significance are This icon advises the reader that the information following is of key importance This Icon alerts the reader that the inform...

Страница 8: ...V single phase 230V single phase 230V single phase 230V single phase 230V single phase 230V single phase 230V single phase 230V single phase 230V three phases 230V three phases Circuit protector Ampacity 10 A 10 A 10 A 10 A 10 A 10 A 16 A 16 A 16 A 16 A Curve of release of the circuit breaker Curve C Curve C Curve C Curve C Curve C Curve C Curve C Curve C Curve C Curve C Power supply conductor 60 ...

Страница 9: ... not be blocked Maximum cable length between the UV reactor and the electrical unit is 3 meters Electrical unit external view Electrical unit internal view 7 24Vdc Power supply connector block 6 circuit breaker 8 Electronic ballasts 1 Monitor 4 Manual ON OFF switch 2 Lamp operating indicator light 5 Default indicator light 3 Power indicator light ...

Страница 10: ...on system at the bypass location Three valves are required to accommodate a full bypass of the UV reactor One valve is a bypass valve that normally remains closed at all times while the UV system is in operation and two valves isolate the UV reactor in closed position when accessing the reactor for normal service such as quartz tube or wiper ring replacement If you use the bypass the water circula...

Страница 11: ...ps Ballasts and Control The reactor could be turn on 24h 24 and anyway must be slaved to the filtration in order to desinfect at the same time DIAGRAM Wiring Terminal Lug Provided with the electrical unit Screw M6x20 Provided with the electrical unit Screw 6x30 minimum Not provided with the electrical unit Use this hole to fixe the electrical unit in the wall Main Earthing Ground 60 C copper Condu...

Страница 12: ... you can unplug the wires without risk 24 124 Diagram Terminal connections on the reactor I15 24 124 Lug for vessel bonding to the main earthing ground Lugs for vessel bonding to the equipotential bond Equipotential bond You may use these lugs to connect exposed dead metal that may become energized to the rest of the exposed dead metal around the pool area Main earthing ground Connected to the sup...

Страница 13: ...ly the indicator light for each lamp should be lit 5 Check that the hour counter is running C 2 Calibration of the UV sensor OPERATION for CALIBRATION 1 Turn on the on off switch on the front of the electrical cabinet 2 The UV C lamps will heat up to their maximum output level in 2 minutes depending on the temperature of the liquid being treated 3 Now you have to calibrate the sensor in its liquid...

Страница 14: ...lamps are faulty Diagnose the cause of the breakdown This message appears when the intensity of the UVC radiation falls below the pre alarm threshold Check that the quartz sleeves are clean Check that the UV sensor is clean N B when the lamps have been operating for a certain number of hours this message appears naturally normal wear of the lamps This message appears when intensity of the UVC radi...

Страница 15: ...ver to manual regulation 100 before calibrating the sensor B Display of lamp operating time It is recommended to reset this counter at zero when you change a lamp B1 Reset the hour counter and the number of lamp start ups at zero C Display the reactor s total operating time since commissioning This counter cannot be reset at zero D Display of the number of lamp start ups carried out Resetting at z...

Страница 16: ...Do not remove the screw making the watertightness of the quartz sleeve it s not necessary to change only the lamps 3 Remove each lamp connector the ground connectors and the temperature connector 4 Make sure that UV lamps are sufficiently cooled before handling it 5 Take the top of the lamp and disengage the lamp from the quartz sleeve keeping it correctly aligned with the axis Carry out this oper...

Страница 17: ...112 05 12 Copyright Delta UV Page 17 9 Refit the bonnet 10 Check the calibration of the UV C ray measurement sensor See chapter on the setting of the UV Monitor Open the valve turn on the filtration turn on the on off switch ...

Страница 18: ... 9 The quartz sleeve exterior can normally be cleaned by using acid or spirit vinegar or pH minus liquid with weak concentration ratio of 4 parts water to one part acid Do not use abrasive cleaners REASSEMBLY 10 CAREFULLY insert the sleeve in the unit keeping it correctly aligned with the axis Your medium or index finger will help you to correctly drive and to find easier the socket at the bottom ...

Страница 19: ...tighten the nut by hand tightening it normally to the maximum 13 Open the valve start the filtration when the unit is under pressure the vessel is pressured and then you can check that there is no leakage in the quartz tube and at the watertightness 14 Make the operations 6 to 10 of Replace remove UV lamps see previous pages ...

Страница 20: ...d STEP OPERATION 1 Close the valves 2 and 3 et open the valve 1 2 Fill the PVC tank with 1 liter of muriatic acid 3 Open the valve 4 4 Open slowly the valve 5 till the level of the PVC goes down then close valve 5 5 Close valve 4 6 Leave it during 1 hour 7 Open the valve 5 and empty the UV reactor 8 Close the valve 4 and 5 9 Run the UV reactor on Open the valve 2 Open slowly the valve 3 Close the ...

Страница 21: ...ELP AM Series Manual 20112 05 12 Copyright Delta UV Page 21 E 4 MAINTENANCE FILE Date ACTION By CAUTION This sheet must be kept up to date It provides a record of the reactor s operating cycle ...

Страница 22: ... This message appears when the intensity of the UVC radiation falls below the pre alarm threshold Check that the quartz sleeves are clean Check that the UV sensor is clean N B when the lamps have been operating for a certain number of hours this message appears naturally normal wear of the lamps This message appears when intensity of the UVC radiation falls below the main alarm threshold Check tha...

Страница 23: ...urned to Delta UV with details of the unit type and serial number for exchange after technical evaluation Shipping costs will be shared between the retailer and Delta UV The guarantee runs from the day of installation this date must be notified to Delta UV by returning the guarantee validation form by post or fax If the instructions for installation and use are not followed Delta UV cannot accept ...

Страница 24: ...ating indicator 70 02618 3 Power light indicator 70 02616 4 Default light indicator 70 02603 6 Circuit breaker Contact us 7 24Vdc power supply 70 02601 8 Ballast 70 10610 N DESIGNATION REFERENCE UV lamp 70 18610 Quartz sleeve join 44 02256 Quartz sleeve 70 50610 Bimetal Thermostat 70 02606 Micro switch 70 02257 UV SENSOR 70 02607 T ...

Страница 25: ...ELP AM Series Manual 20112 05 12 Copyright Delta UV Page 25 ANNEX 1 Clearance dimensions Blown up view Designation ...

Страница 26: ...ELP AM Series Manual 20112 05 12 Copyright Delta UV Page 26 ANNEX 2 Electrical diagrams ...

Отзывы: