![Delta Tau PBC Series Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/delta-tau/pbc-series/pbc-series_hardware-reference-manual_2478527023.webp)
Power Brick Controller User Manual
Mounting
23
MOUNTING
The location of the Power Brick Controller is important. Installation should be in an area that is protected
from direct sunlight, corrosives, harmful gases or liquids, dust, metallic particles, and other contaminants.
Exposure to these can reduce the operating life and degrade performance of the drive.
Several other factors should be carefully evaluated when selecting a location for installation:
For effective cooling and maintenance, the Power Brick Controller should be mounted on a smooth,
non-flammable vertical surface.
At least 76 mm (3 inches) top and bottom clearance must be provided for air flow. At least 10 mm
(0.4 inches) clearance is required between units (each side).
Temperature, humidity and Vibration specifications should also be taken in account.
Caution
Unit must be installed in an enclosure that meets the environmental IP
rating of the end product (ventilation or cooling may be necessary to
prevent enclosure ambient from exceeding 45 °C [113 °F]).
The Power Brick Controller can be mounted with a traditional 3-hole panel mount, two U shape/notches on
the bottom and one pear shaped hole on top.
If multiple Power Brick Controllers are used, they can be mounted side-by-side, leaving at least a 122 mm
clearance between drives. This means a 122 mm center-to-center distance (0.4 inches). It is extremely
important that the airflow is not obstructed by the placement of conduit tracks or other devices in the
enclosure.
If the drive is mounted to a back panel, the back panel should be unpainted and electrically conductive to
allow for reduced electrical noise interference. The back panel should be machined to accept the mounting
bolt pattern of the drive.
The Power Brick Controller can be mounted to the back panel using three M4 screws and internal-tooth
lock washers. It is important that the teeth break through any anodizing on the drive’s mounting gears to
provide a good electrically conductive path in as many places as possible. Mount the drive on the back
panel so there is airflow at both the top and bottom areas of the drive (at least three inches).
Содержание PBC Series
Страница 5: ......
Страница 74: ...Power Brick Controller User Manual Connections and Software Setup 74 Motor 1 HomeOffset 0...
Страница 203: ...Power Brick Controller User Manual Appendix A Digital Inputs Schematic 203 APPENDIX A DIGITAL INPUTS SCHEMATIC...
Страница 204: ...Power Brick Controller User Manual Appendix B Digital Outputs Schematic 204 APPENDIX B DIGITAL OUTPUTS SCHEMATIC...
Страница 205: ...Power Brick Controller User Manual Appendix C Analog I Os Schematics 205 APPENDIX C ANALOG I OS SCHEMATICS...
Страница 206: ...Power Brick Controller User Manual Appendix C Analog I Os Schematics 206...
Страница 207: ...Power Brick Controller User Manual Appendix D Limits Flags Schematic 207 APPENDIX D LIMITS FLAGS SCHEMATIC...