48
PowerConnect B-MLXe Hardware Installation Guide
53-1002111-01
Installing a PowerConnect B-MLXe-8 router
2
Installing PowerConnect B-MLXe-8 modules
The sequence for installing multiple modules is important to ensure proper fit. The recommended
sequence for the PowerConnect B-MLXe-8 router is to install right-to-left, beginning with the lowest
row and moving up.
NOTE
installation instructions are identical for interface, management, and switch fabric modules.
DANGER
The intra-building ports of the equipment or subassembly are suitable for connection to
intra-building or unexposed wiring or cabling only. The intra-building ports of the equipment or
subassembly MUST NOT be metallically connected to interfaces that connect to the outside plant
(OSP) or its wiring. These interfaces are designed for use as intra-building interfaces only (Type 2
or Type 4 ports as described in GR-1089-CORE, Issue 4) and require isolation from the exposed
OSP cabling. The addition of Primary Protectors is not sufficient protection in order to connect
these interfaces metallically to OSP wiring.
NOTE
PowerConnect B-MLXe modules are dedicated, which means that you must install them in the
PowerConnect B-MLXe router only. If you try to install a PowerConnect B-MLXe module in a
non-PowerConnect B-MLXe router, or install a module intended for a non-PowerConnect B-MLXe
router in a PowerConnect B-MLXe router, the router and module will not function properly.
Table 14
identifies the router slot numbers where the modules must be installed. An identifying
label can be seen at the base of each slot.
For information about how to disable and re-enable power to interface modules, see
“Disabling and
re-enabling power to interface modules”
on page 99
NOTE
The PowerConnect B-MLXe-8 router ships with the required switch fabric modules installed.
CAUTION
If you do not install a module in a slot, you must leave the slot blank installed in the slot. If you
run the router with an uncovered slot, the system may overheat.
TABLE 14
PowerConnect B-MLXe-8 module slot designations
Module
Slot number
Management modules
Active module – M1 (left).
Redundant module – M2 (right).
Interface modules
1 – 8
Switch fabric modules
SF1 – SF3
Содержание PowerConnect B - MLXe 16
Страница 1: ...53 1002111 01 02 November 2010 PowerConnect B MLXe Hardware Installation Guide ...
Страница 34: ...22 PowerConnect B MLXe Hardware Installation Guide 53 1002111 01 Supported software features 1 ...
Страница 136: ...124 PowerConnect B MLXe Hardware Installation Guide 53 1002111 01 Removing MAC address entries 5 ...
Страница 194: ...182 PowerConnect B MLXe Hardware Installation Guide 53 1002111 01 Power cords 8 ...
Страница 198: ...186 PowerConnect B MLXe Hardware Installation Guide 53 1002111 01 Russia A ...
Страница 212: ...200 PowerConnect B MLXe Hardware Installation Guide 53 1002111 01 Dangers B ...