PowerConnect B-FCX Switch Hardware Installation Guide
55
53-1002267-01
Replacing a copper or fiber optic module
4
FIGURE 36
Unlocking the bail latch
FIGURE 37
Removing the bail latch
NOTE
The bail latch may be attached to either the top or the bottom of the mini-GBIC.
4. Grasp the bail latch and pull the copper or fiber optic module out of the port.
FIGURE 38
Remove fiber optic module
5. Store the
copper or
fiber optic module in a safe, static-free place or in an anti-static bag.
6. Install a new
copper or
fiber optic module in the port.
Cabling a fiber optic module
For instructions on cabling a fiber optic module refer to
“Cabling a fiber optic transceiver”
on
page 42.
Cleaning the fiber optic connectors
For instructions on cleaning a fiber optic module refer to
“Cleaning the fiber optic connectors”
on
page 43.
1
Bail Latch
1
Содержание PowerConnect B-FCX
Страница 1: ...53 1002267 01 18 March 2011 PowerConnect B FCX Switch Hardware Installation Guide ...
Страница 6: ...vi PowerConnect B FCX Switch Hardware Installation Guide 53 1002267 01 ...
Страница 10: ...x PowerConnect B FCX Switch Hardware Installation Guide 53 1002267 01 ...
Страница 58: ...48 PowerConnect B FCX Switch Hardware Installation Guide 53 1002267 01 Troubleshooting network connections 3 ...
Страница 74: ...64 PowerConnect B FCX Switch Hardware Installation Guide 53 1002267 01 Hardware specifications 5 ...
Страница 80: ...70 PowerConnect B FCX Switch Hardware Installation Guide 53 1002267 01 Regulatory compliance A ...
Страница 86: ...76 PowerConnect B FCX Switch Hardware Installation Guide 53 1002267 01 Danger notices B ...