Figure 26. Rail installation
a. Align the right rail with the lower U of the allotted 4U space.
NOTE:
Each of the rail alignment pins must be located in the middle holes of the bottom two U spaces of the 4U
space.
b. With the release latch on the outer (rear) part of the rear channel, place the catch mechanism over the channel.
c. Push the rail back to secure the rail adapters in the cabinet channel. An audible click indicates that the rail is secure in the
channel.
d. Make sure the rear post/catch mechanism is secure and attached.
Install the Disk Shelves in the Rack
31
Содержание Data Domain DD9500
Страница 1: ...Dell EMC Data Domain DD9500 System Installation and Storage Expansion Guide November 2021 Rev 02 ...
Страница 65: ...Figure 66 DD9500 with ES30 shelves ERSO Connect Cables and Power On 65 ...
Страница 68: ...Figure 68 DD9500 with DS60 shelves DD9500 with HA For an HA DD9500 pair 68 Connect Cables and Power On ...
Страница 70: ...Figure 69 DD9500 with DS60 shelves HA 70 Connect Cables and Power On ...