Install the Data Domain cable management assembly
Steps
1. Take out the cable management assembly (CMA) from its packaging.
2. Locate the two blue knobs (on the left and right sides of the CMA) in the back which you will need to pull away from the
side of the CMA brackets to install the CMA in the rack.
Figure 17. Data Domain CMA back
3. Pull the knobs away from the side of the CMA brackets towards the direction of the white arrow (see picture) and turn the
blue knobs in the direction of the yellow arrow (on the left and right sides of the CMA) so the tip of the knob is pulled away
from the side of the bracket to fit in the rail slot.
Figure 18. Data Domain cable management assembly back inside
4. Locate the slots and the hole in the Data Domain rail to attach the CMA by following the arrows in the picture. Align and
insert the CMA tabs in the slots and the blue knob in the hole of the rail bracket on both sides.
22
Install the System in the Rack
Содержание Data Domain DD9500
Страница 1: ...Dell EMC Data Domain DD9500 System Installation and Storage Expansion Guide November 2021 Rev 02 ...
Страница 65: ...Figure 66 DD9500 with ES30 shelves ERSO Connect Cables and Power On 65 ...
Страница 68: ...Figure 68 DD9500 with DS60 shelves DD9500 with HA For an HA DD9500 pair 68 Connect Cables and Power On ...
Страница 70: ...Figure 69 DD9500 with DS60 shelves HA 70 Connect Cables and Power On ...