Table 26. DD9500 with DS60 ERSO cabling instructions
String (Loop) I/O - Port
Shelf Port
Length
1
I/O 6 - Port 0
A controller port 0 of shelf V1.1
2M
1
I/O 2 - Port 1
B controller port 0 of the highest number shelf in V1
2M
2
I/O 3 - Port 0
A controller port 0 of shelf V2.1
2M
2
I/O 2 - Port 0
B controller port 0 of the highest number shelf in V2
2M
3
I/O 9 - Port 2
A controller port 0 of shelf V3.1
2M
3
I/O 3 - Port 1
B controller port 0 of the highest number shelf in V3
5M
4
I/O 2 - Port 2
A controller port 0 of shelf V4.1
5M
4
I/O 3 - Port 2
B controller port 0 of the highest number shelf in V4
5M
5
I/O 2 - Port 3
A controller port 0 of shelf V5.1
5M
5
I/O 9 - Port 0
B controller port 0 of the highest number shelf in V5
5M
6
I/O 9 - Port 3
A controller port 0 of shelf V6.1
5M
6
I/O 6 - Port 1
B controller port 0 of the highest number shelf in V6
5M
7
I/O 6 - Port 2
A controller port 0 of shelf V7.1
5M
7
I/O 9 - Port 1
B controller port 0 of the highest number shelf in V7
5M
8
I/O 6 - Port 3
A controller HOST
port of the SSD shelf or DD Cloud Tier metadata
shelf
2M
8
I/O 3 - Port 3
B controller HOST
port of the SSD shelf or DD Cloud Tier metadata
shelf
2M
a.
Cable lengths shown are designed for Data Domain racks. Longer cables (up to 5M) can be used.
Connect Cables and Power On
75
Содержание Data Domain DD9500
Страница 1: ...Dell EMC Data Domain DD9500 System Installation and Storage Expansion Guide November 2021 Rev 02 ...
Страница 65: ...Figure 66 DD9500 with ES30 shelves ERSO Connect Cables and Power On 65 ...
Страница 68: ...Figure 68 DD9500 with DS60 shelves DD9500 with HA For an HA DD9500 pair 68 Connect Cables and Power On ...
Страница 70: ...Figure 69 DD9500 with DS60 shelves HA 70 Connect Cables and Power On ...