For more information, see
Troubleshooting the Hardware ISO
on page 65 .
c. Press q to exit the log viewer, and then Alt+F1 to access the original console
screen.
11. Reboot the ScaleIO Ready Node server and allow the update and configuration
jobs to complete. Power-cycle the server using the appropriate Power menu
option.
12. For each ScaleIO Ready Node server, after the updates are finalized, clear the
iDRAC job queue using the iDRAC GUI:
a. From your Internet browser, go to https://
<iDRAC_IP_address>.
b. In the DELL Console Login window, type these credentials:
l
username: root
l
password:
<password> (for Dell-supplied nodes) or password (for EMC-
supplied nodes)
c. Click Login.
d. In the iDRAC GUI navigation pane, select the Maintenance tab, and then
select the Job Queue tab.
e. Ensure that all jobs have completed successfully. Any job failures may
require re-running the bootable ISO, or further troubleshooting.
f. Select the checkbox for all of items in the Job Queue list, and then click
Delete.
13. Continue with OS installation and configuration, ScaleIO deployment, and other
required tasks.
At the end of the process, the BIOS password changes to emcbios.
Configuring the Hardware
24
Hardware Configuration and Operating System Installation Guide - Windows Servers
Содержание 302-004-341
Страница 6: ...FIGURES 6 Hardware Configuration and Operating System Installation Guide Windows Servers ...
Страница 8: ...TABLES 8 Hardware Configuration and Operating System Installation Guide Windows Servers ...
Страница 48: ...Port Configuration 48 Hardware Configuration and Operating System Installation Guide Windows Servers ...
Страница 70: ...Index 70 Hardware Configuration and Operating System Installation Guide Windows Servers ...