Figure 32 Blue tab on rail must be pushed in
CL5504
About this task
Note:
This procedure describes the installation of the 1U cable management tray into a
standard Dell EMC rack. For third-party racks, use the additional hardware that comes with
the 1U cable management arm to install the rails as necessary.
The rails come preassembled with adapters that fit into standard round mounting holes. If the rack
has a different configuration, use the adapters in the hardware kit that come with the tray to
mount the rails.
Procedure
1. Identify the left and right rails. Orient the rails so that the UP arrow is pointed up and the
end of the rails that are labeled FRONT is at the front of the rack.
Figure 33 Installing and securing the rails—front
CL5495
Install the Disk Shelves in the Rack
Dell EMC PowerProtect DD9900 System Installation Guide
45
Содержание PowerProtect DD9900
Страница 1: ...Dell EMC PowerProtect DD9900 System Installation Guide Revision 01 September 2019...
Страница 8: ...Tables 8 Dell EMC PowerProtect DD9900 System Installation Guide...
Страница 18: ...Introduction and Preparation 18 Dell EMC PowerProtect DD9900 System Installation Guide...
Страница 32: ...Install the System in the Rack 32 Dell EMC PowerProtect DD9900 System Installation Guide...
Страница 70: ...Connect Cables and Power On 70 Dell EMC PowerProtect DD9900 System Installation Guide...
Страница 96: ...Configure System for Use 96 Dell EMC PowerProtect DD9900 System Installation Guide...