Страница 1: ...Dell EMC PowerProtect DD9900 System Installation Guide Revision 01 September 2019...

Страница 2: ...ND SPECIFICALLY DISCLAIMS IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE USE COPYING AND DISTRIBUTION OF ANY DELL SOFTWARE DESCRIBED IN THIS PUBLICATION REQUIRES AN APPLICAB...

Страница 3: ...8 Install the Disk Shelves in the Rack 33 Remove filler panels 34 Install a DS60 shelf into the rack 34 Installing rails 34 Installing the shelf onto the rails 38 Inserting and securing the top cover...

Страница 4: ...the network 76 Configuring additional system parameters 78 Configuring the system with the configuration wizard 79 License page 79 Network 80 File System 82 System Settings 86 DD Boost protocol 87 CI...

Страница 5: ...ing semi captive screws 42 Installing ears to rack using truss head screws 42 Installing top cover using truss head screws shelf and rack not shown 43 Removal of semi captive screws 43 Blue tab on rai...

Страница 6: ...the front of the shelf 62 Installing the bezel 62 DD9900 with DS60 shelves 66 HA interconnect 67 Slot numbering 67 Routing cables through the CMA brackets 69 iDRAC Settings Network 72 iDRAC Settings...

Страница 7: ...ing 75 Communications settings 75 License Configuration page values 80 General page settings 80 Interfaces page settings 81 DNS page settings 81 Addable Storage 83 Active Tier values 83 Addable Storag...

Страница 8: ...Tables 8 Dell EMC PowerProtect DD9900 System Installation Guide...

Страница 9: ...l Document purpose 10 l DD9900 system features 10 l Product serial number tag PSNT 11 l Required tools and supplies 13 l Safety considerations 14 l Working with a portable lift 15 Dell EMC PowerProte...

Страница 10: ...low the instructions in Configure System for Use on page 71 to configure factory racked systems The following documents available from the Online Support website provide additional information about f...

Страница 11: ...100 GbE QSFP28 4 maximum 2 port QL41000 25 GbE SFP28 4 maximum 4 port QL41164 10 GbE SFP 4 maximum 4 port QL41164 10GBASE T 4 maximum 4 port QLE2694 16 Gb FC 4 maximum Network Daughter Card option 4 p...

Страница 12: ...tag There are two labels on each tag l The top label is blue and contains the serial number for the system top level assembly TLA l The bottom label is white and contains the serial number required fo...

Страница 13: ...4 in blade n Torque l Flashlight free standing for single person installations l Roll of 5 8 inch Velcro cable tie material 3M Scotchmate SJ 3401 or similar l Null modem cable with DB 9 female connect...

Страница 14: ...of the power sources before applying power l A DD9900 system must be operated only from a power supply input voltage range of 200 240 VAC and 50 60 Hz l DS60 shelves use 200 240 VAC and 50 60 Hz l ES...

Страница 15: ...ments Lift requirements For installations in racks that are 28U 49 inches or less above the floor use the lower mast which is rated for 400 pounds For installations in racks that are more than 28U 49...

Страница 16: ...components above 49 inches 28U from the floor use the single lower mast configuration with the Voyager conversion kit and support table Refer to the following figure while performing this task Proced...

Страница 17: ...Figure 5 Reconfiguring the portable lift with the Voyager conversion kit CL5422 1 2 Introduction and Preparation Dell EMC PowerProtect DD9900 System Installation Guide 17...

Страница 18: ...Introduction and Preparation 18 Dell EMC PowerProtect DD9900 System Installation Guide...

Страница 19: ...the system 20 l Rail kit components 21 l Remove the original CMA brackets 22 l Attach the new CMA brackets 23 l Install the rails 25 l Install the system in the cabinet 26 l Installing a custom OEM be...

Страница 20: ...nded rack locations support the cabling described in this document Installing in other locations might require different cable lengths The following table lists the recommended locations for installin...

Страница 21: ...field replaceable units FRUs The rails are compatible with racks with square holes unthreaded round holes and threaded round holes Figure 6 Sliding rail assembly 3U systems 1 Sliding rail 2 2 Hook an...

Страница 22: ...tors Figure 8 CMA arms and separators Remove the original CMA brackets About this task The system rails may ship with CMA brackets already attached If the brackets are attached they must be removed In...

Страница 23: ...p for the second rail Attach the new CMA brackets About this task The brackets are labeled left and right and cannot be interchanged The top of each bracket is labeled Up Procedure 1 Use the included...

Страница 24: ...f the inner bracket and push down to attach it to the rail Note Some pressure is required to push the inner bracket down and secure it The bracket clicks when it locks in place Install the System in t...

Страница 25: ...Right Front Install the left rail first and then repeat the procedure for the right rail Procedure 1 Hold the rail with the rail end pieces labeled FRONT facing the front of the rack flanges 2 Align t...

Страница 26: ...r slide rails out of the cabinet until they lock into place 2 Align the rear standoffs on each side of the system with the rear J slots on the slide rails and then lower the system until the remaining...

Страница 27: ...rew 2 8 Slam latch 2 Installing a custom OEM bezel faceplate Procedure 1 Align the custom faceplate with the OEM bezel 2 Using a Phillips 1 screw driver secure the opposite ends of the faceplate to th...

Страница 28: ...2U bezel 9 screws l 3U bezel 8 screws l 4U bezel 16 screws 4 Install the optional front bezel 5 Install the standard faceplate into the original bezel before returning Install the CMA arms Procedure...

Страница 29: ...ll the first arm on the right side of the chassis on top of the separator with the open side up Note The arms are reversible Figure 15 Install the first arm Install the System in the Rack Dell EMC Pow...

Страница 30: ...the first arm 4 Install the second separator on top of the first arm Figure 17 Install the second separator 5 Install the second arm on the left side of the chassis on top of the separator with the o...

Страница 31: ...e second arm 6 Close the first arm by connecting it to the bracket on the right side of the chassis Figure 19 Close the second arm Install the System in the Rack Dell EMC PowerProtect DD9900 System In...

Страница 32: ...Install the System in the Rack 32 Dell EMC PowerProtect DD9900 System Installation Guide...

Страница 33: ...R 3 Install the Disk Shelves in the Rack l Remove filler panels 34 l Install a DS60 shelf into the rack 34 l Install an FS25 shelf into the rack 58 Dell EMC PowerProtect DD9900 System Installation Gui...

Страница 34: ...ou will install the shelf The 4U rack includes inner rails that slide into the cabinet rail assembly CAUTION Exercise care when installing the short rails Exposed metal edges may be sharp and could da...

Страница 35: ...per kit Used in racks that have M5 10 or 12 threaded holes 036 028 017 4 8MM Alignment Pin Quantity 8 per kit Used in racks that have M6 threaded holes 4 Install the right rail to the rack rear chann...

Страница 36: ...following figure b With the release latch on the outer rear part of the rear channel place the catch mechanism over the channel c Push the rail back to secure the rail adapters in the cabinet channel...

Страница 37: ...holes of the bottom two U spaces of the 4U space An audible click indicates that the connection is secure Figure 22 Installing the right rail to the front channel Front Right CL4866 6 Install the lef...

Страница 38: ...three people to install About this task CAUTION Secure the enclosure to the portable lift using the securing straps before moving the lift If you are installing a populated shelf refer to Figure 23 o...

Страница 39: ...g tabs as shown in the following figure and carefully slide the shelf into the cabinet as far as the lift allows Figure 24 Unlocking the casters CL5424 5 Lock all four casters by pressing down on the...

Страница 40: ...f the shelf was depopulated before installation repopulate the shelf as follows a Reinstall the disk drives in the exact location from which they were removed b Reinstall the Fan modules c Slide the s...

Страница 41: ...illips with patch Can be used in non Dell EMC racks Procedure 1 For Dell EMC racks use the orange shelf latch handles to push the shelf completely into the cabinet Align the two semi captive M5 should...

Страница 42: ...do not have any hardware installed into the top cover In these configurations use the appropriate truss head screw to attach the top cover to the cabinet l Some configurations have semi captive screw...

Страница 43: ...e cabinet and thread the screw into the mounting hole l For a third party rack that is not compatible with the semi captive screw remove the semi captive screw by pulling the screw assembly out the si...

Страница 44: ...ils Used in racks that have threaded holes These go into the threaded hole for support Rail kit mounting brackets adjust in length from 24 inches to 32 inches to accommodate different rack depths Inst...

Страница 45: ...preassembled with adapters that fit into standard round mounting holes If the rack has a different configuration use the adapters in the hardware kit that come with the tray to mount the rails Proced...

Страница 46: ...kage one in the front of the rail and one in the rear of the rail Torque the screws to 12 16 inch pounds Repeat for the other rail Figure 35 Installing tray 3 Orient the tray so that the UP arrow is p...

Страница 47: ...ns CL5505 5 Refer to the application guide for the shelf you are installing Using the 1 inch graduations on the back edge of the tray route the cables through the cable chains to their suggested lengt...

Страница 48: ...es are all facing each other Arrange the two cable chains so that they form a U shape Figure 40 Attaching cable chains to tray 7 Attach the Cable Chains to the tray by attaching the clips onto the tab...

Страница 49: ...ate with the slots 11 Refer to the application guide and connect the cables as required Dress the cable runs with proper cable strain reliefs when routing to the rack Disconnecting cables for a shelf...

Страница 50: ...ing rails to the NEMA channel especially channels with square holes install the screws loosely to prevent cross threading and tighten by hand Do not over torque l Use black M5 screws which align with...

Страница 51: ...igure 45 18 22 marking CL5501 e Slide the inner rail mechanism to the front of the rail until the 18 22 mark is visible If the inner mechanism is locked depress the leaf spring and press the rail lock...

Страница 52: ...the rail to 30 34 longest setting do the following a Orient one of the rails to identify the front of the rail so that the inside of the rail is visible with the spacing markings visible b Locate the...

Страница 53: ...suggested use Table 5 Pins for third party racks Rail Pins from kit Part Number and Description Suggested Use 036 028 018 Custom screw M4 x 10MM Quantity 4 per kit Used for any third party rack Can b...

Страница 54: ...Figure 48 Rail installation Install the Disk Shelves in the Rack 54 Dell EMC PowerProtect DD9900 System Installation Guide...

Страница 55: ...rect location c Push the rail back to secure the rail posts in the cabinet channel An audible click indicates that the rail is secure in the channel Make sure the rear post catch mechanism is secure a...

Страница 56: ...ill pass through the threaded hole in the NEMA racks l If you are installing the rails in a rack that does not have threaded holes insert an M5 screw that comes with the chassis into the larger of the...

Страница 57: ...he figure below Table 8 List of parts used in nutbar installation illustration Image Description Qty Part number 1 Nutbar location in 4U space 1 ea Nutbars Left 051 000 357 Right 051 000 356 2 Rail lo...

Страница 58: ...r 051 000 357 directly above the rail assembly 2 Secure the nutbar with two M5 securing screws one above the top alignment pin and one below the lower alignment pin 3 Repeat the previous steps for the...

Страница 59: ...r rack channel with the rail extended as shown in the following figure Figure 53 Push rail into rear channel mounting holes 3 Push the rail into the rear mounting holes until the spring clips snap int...

Страница 60: ...ION Ensure the spring clip is securely attached to the channel It may be necessary to push in on the clip to assist in snapping it into place Installing the shelf on the rails About this task CAUTION...

Страница 61: ...shelf The tabs secure and support the rear of the shelf Figure 57 Rail tabs securing the rear of the shelf CL5994 2 Secure the front of the shelf to the front vertical channels with four screws two p...

Страница 62: ...e 62 while performing this procedure Note If the rack is equipped with a door on the front the shelf ships with an EMI shield instead of a bezel Procedure 1 If present remove the protective plastic st...

Страница 63: ...s 64 l Connecting the HA interconnect 66 l Connecting data cables 67 l Connecting disk shelf power cables 68 l Connecting controller power cables and powering on 68 l Routing the cables through the CM...

Страница 64: ...e FS25 SSD shelf is cabled as a separate set from the DS60 shelves Table 9 DD9900 with DS60 cabling instructions Single node or HA primary node String Loop I O Port Shelf Port Length a 1 I O 7 Port A...

Страница 65: ...ed Table 11 DD9900 with DS60 cabling instructions DS60 to DS60 String Loop First Shelf Port Second Shelf Port Length a 1 LCC A port 2 of shelf V1 1 LCC A port 0 of the next shelf in V1 2M 1 LCC B port...

Страница 66: ...on the standby node 2 Connect a 10G Base T cable from port 3 of the network daughter card on the primary node to port 3 of the network daughter card on the standby node 3 Connect a 10G Base T cable f...

Страница 67: ...ots 11 13 are inverted The port numbering on these I O modules in these slots goes from right to left with ethXa on the right For vertical I O module NIC interfaces the port numbering goes from top to...

Страница 68: ...e shelf to power off About this task ES40 and FS25 shelves have one power cord per power supply for a total of two power cords DS60 shelves have two power cords per power supply for a total of four po...

Страница 69: ...rol panel at the front of the chassis to power on the system Routing the cables through the CMA Procedure 1 Run the cables through the CMA 2 Use velcro straps to keep the cables in place Figure 63 Rou...

Страница 70: ...Connect Cables and Power On 70 Dell EMC PowerProtect DD9900 System Installation Guide...

Страница 71: ...ange the iDRAC network port 74 l Enable administrative communication 75 l Run the configuration wizard 76 l Configuring the system with the configuration wizard 79 l Use iDRAC to power the system on a...

Страница 72: ...d in any of these areas Procedure 1 Connect to the system serial console or connect KVM to the system 2 Reboot the system 3 During the system boot process press F2 to access the BIOS menu 4 Select iDR...

Страница 73: ...tect system provides the ability to access the serial console through the iDRAC interface Configuring SOL is optional If SOL is already enabled on the system no further action is required CAUTION Do n...

Страница 74: ...umber is set to 22 11 Click Apply to save any changes 12 Select Configuration BIOS Settings Serial Communications 13 Click Apply and Reboot 14 Select Maintenance Job Queue and verify the Configure BIO...

Страница 75: ...istrative communication The serial port and dedicated iDRAC9 dedicated management port at the rear of the system are the only supported interfaces for console access Do not connect to the USB and iDRA...

Страница 76: ...er with the serial number on it is located on the front of the system Password system_serial_number Note If you type an incorrect password four consecutive times the system locks out the specified use...

Страница 77: ...1 7 Enter the IPv6 address of the default routing gateway Or accept the IPv6 address of the default gateway if the system was able to discover it If IPv6 is not in use leave the field empty and press...

Страница 78: ...system parameters Open a web browser and enter your Data Domain system s IP address in the browser s address text box Log in when the DD System Manager login screen displays Use the DD System Manager...

Страница 79: ...r configuration wizard after the initial configuration of your protection system For instructions on running the configuration wizards at system startup see the Installation Guide for your system mode...

Страница 80: ...ct network settings from a Dynamic Host Control Protocol DHCP server When you configure the network interfaces at least one of the interfaces should be configured to use DHCP Manually Configure Select...

Страница 81: ...k Displays whether the Ethernet link is active Yes or not No Network DNS page The DNS page enables you to configure IP addresses for DNS servers to convert hostnames to IP addresses and vice versa To...

Страница 82: ...e file system Configure storage tier pages The configure storage tier pages enable you to configure storage for each licensed tier on the system Active Tier Cache Tier and Cloud Tier Each tier has a s...

Страница 83: ...sk space defines one gibibyte as 230 bytes giving a different disk capacity than the manufacturer s rating Table 20 Active Tier values Item Description ID Device in DDVE The disk identifier which can...

Страница 84: ...he data storage capacity of the disk a Type SAS SSD a The DD OS convention for computing disk space defines one gibibyte as 230 bytes giving a different disk capacity than the manufacturer s rating Ta...

Страница 85: ...y applies to DDVE instances a The DD OS convention for computing disk space defines one gibibyte as 230 bytes giving a different disk capacity than the manufacturer s rating Table 24 Cloud Tier values...

Страница 86: ...system communicates with the administrator Table 25 Administrator page settings Item Description User Name The default administrator name is sysadmin The sysadmin user cannot be renamed or deleted Ol...

Страница 87: ...ion of your system If you specify a location this information is stored as the SNMP system location DD Boost protocol The DD Boost settings section enables you to configure the DD Boost protocol setti...

Страница 88: ...an access group or X to delete an access group Table 28 Fibre Channel page settings Item Description Configure DD Boost over Fibre Channel Select the checkbox if you want to configure DD Boost over F...

Страница 89: ...f the configuration wizard select Protocols CIFS Shares Create Table 30 Share page settings Item Description Share Name Enter a share name for the system Directory Path Enter a directory path for the...

Страница 90: ...Tape Libraries VTL Service Libraries More Tasks Library Create Table 32 Library page settings Item Description Library Name Enter a name of from 1 to 32 alphanumeric characters Number of Drives Numbe...

Страница 91: ...tor name by entering a new one An initiator is a backup client that connects to a system to read and write data using the Fibre Channel FC protocol A specific initiator can support DD Boost over FC or...

Страница 92: ...an HA pair sets the system password on the standby node to match the system password on the active node however that synchronization is not set until the HA configuration is complete If the HA config...

Страница 93: ...rent continue to Step 4 l If the values in the Subject column on both nodes are the same a Change the hostname of the standby node b Run the adminaccess certificate generate self signed cert regenerat...

Страница 94: ...splays System is misconfigured the SSDs were not removed from the front of the primary node Run the enclosure show misconfiguration command to get more details 9 Verify the HA status Run the following...

Страница 95: ...enclosure number 12 Enable the filesystem on node 0 Run the following command filesys enable Configure System for Use Dell EMC PowerProtect DD9900 System Installation Guide 95...

Страница 96: ...Configure System for Use 96 Dell EMC PowerProtect DD9900 System Installation Guide...