Sequence of tasks
Complete the installation tasks in the following sequence to ensure a more orderly
installation.
Before you begin
In addition to this document, you will need the following document and tools to
complete installation of ECS in a third-party rack. Be sure the collect the materials
before you begin.
l
The
ECS EX-series EX300 and EX3000 Hardware Guide
, which can be downloaded
from
.
l
A magnetic tip Phillips screw driver 18" or longer for the EX3000chassis rear rail
screws.
l
A magnetic tip Phillips screw driver 4" or shorter for the optional 2U PDU.
Procedure
1. Confirm that the third-party rack meets all requirements specified in
2. Confirm that a mechanical lift is available.
Nodes are provided and racked with all drives installed, requiring a mechanical
lift to install.
The mechanical lift must be rated for at least 60 lbs (27 kg). For more
information about installing heavy equipment with a lift, refer to
DANGER
EX300 nodes with all drives installed weigh 60 lbs (28 kg). We recommend
that you follow this sequence of tasks and install all drives after you install
the EX300 chassis in the rack.
3. Inspect and organize the installation materials.
4. If you are installing 2U PDUs, install all rails, supports, and trays for the PDUs.
5. Install all rails for servers and switches.
6. If you are installing 2U PDUs, install the PDUs.
7. Install servers and 2U bezels.
8. Install switches and 1U bezels.
9. Install the power and network cables according to instructions in the
EX-Series
Hardware Guide
.
10. Complete the hardware installation, including applying system tags and labels.
11. Bring the system online.
12. Return shipping materials.
Third Party Rack Installation Overview
10
EX300
Third-Party Rack Installation Guide
Содержание ECS EX300
Страница 1: ...ECS EX300 Third Party Rack Installation Guide 302 005 206 02 ...
Страница 6: ...FIGURES 6 EX300 Third Party Rack Installation Guide ...
Страница 7: ...Planning your lift 46 1 TABLES EX300 Third Party Rack Installation Guide 7 ...
Страница 8: ...TABLES 8 EX300 Third Party Rack Installation Guide ...
Страница 13: ...Third Party Rack Installation Overview Components for EX300 systems 13 ...
Страница 14: ...Third Party Rack Installation Overview 14 EX300 Third Party Rack Installation Guide ...
Страница 17: ...Figure 1 PDU component location Rail Installation Dell EMC PDU rail and component location 17 ...
Страница 42: ...Bring the system online 42 EX300 Third Party Rack Installation Guide ...