Table 7. List of parts used in nutbar installation illustration
Image #
Description
Qty
Part number
1
Nutbar location in 4U space
1 ea
Nutbars: (Left: 051-000-357), (Right:
051-000-356)
2
Rail location in the 4U space
n/a
N/A
3
Rail bracket alignment pins
n/a
N/A
4
Nutbar alignment pins
n/a
Part of PN 051-000-357 and PN 051-000-356
5
Nutbar M5 securing screws, black
4
PN 036-709-013
Figure 58. Nutbar installation (Left nutbar shown)
NOTE:
The nutbars are not interchangeable. There is a distinct nutbar for the left and right side. Use part numbers for
identification.
50
Install the Disk Shelves in the Rack
Содержание Data Domain DD9800
Страница 1: ...Dell EMC Data Domain DD9800 System Installation Guide September 2020 Rev 02 ...
Страница 65: ...Figure 66 DD9800 with ES30 shelves ERSO Connect Cables and Power On 65 ...
Страница 68: ...Figure 68 DD9800 with DS60 shelves DD9800 with HA For an HA DD9800 pair 68 Connect Cables and Power On ...
Страница 70: ...Figure 69 DD9800 with DS60 shelves HA 70 Connect Cables and Power On ...