Document purpose.............................................................................................................................................................. 8
Tools and supplies needed.................................................................................................................................................8
Safety information...............................................................................................................................................................9
Working with a portable lift............................................................................................................................................. 10
Adjusting the arms for a frontal lift......................................................................................................................... 10
Reconfiguring the lift with the Voyager kit............................................................................................................ 11
Shelf brackets and cable management assembly.................................................................................................13
Install rail brackets on the Data Domain racks (for square or round hole racks)......................................... 15
Install rail brackets using the adapter hardware (for threaded hole racks)................................................... 17
Install the DD9800 system into a rack..........................................................................................................................19
Mount the cable management assembly......................................................................................................................21
Racking and cabling.................................................................................................................................................... 24
Rail kit.............................................................................................................................................................................25
Installing the rails in the cabinet.............................................................................................................................. 25
Adjusting for various rack types.............................................................................................................................. 26
Installing the rails using the adapter hardware.....................................................................................................26
Installing the shelf on the rails..................................................................................................................................28
Installing rails................................................................................................................................................................ 30
Installing the shelf onto the rails..............................................................................................................................33
Inserting and securing the top cover and shelf....................................................................................................35
1U cable management tray installation (underneath)......................................................................................... 38
Connecting the expansion shelves and the controllers........................................................................................... 53
ES30 cable information....................................................................................................................................................53
Connecting multiple ES30 shelves to the DD9800 system.................................................................................... 56
DD9800..........................................................................................................................................................................56
DD9800 with HA (one rack).....................................................................................................................................58
DD9800 with HA (two racks)...................................................................................................................................59
Contents
Contents
3
Содержание Data Domain DD9800
Страница 1: ...Dell EMC Data Domain DD9800 System Installation Guide September 2020 Rev 02 ...
Страница 65: ...Figure 66 DD9800 with ES30 shelves ERSO Connect Cables and Power On 65 ...
Страница 68: ...Figure 68 DD9800 with DS60 shelves DD9800 with HA For an HA DD9800 pair 68 Connect Cables and Power On ...
Страница 70: ...Figure 69 DD9800 with DS60 shelves HA 70 Connect Cables and Power On ...