Installing the 1U cable management tray
The underneath configuration uses the 1U space beneath the shelf. Install the cable management tray before you install the main
chassis.
Prerequisites
●
Ensure that you have determined the correct cable lengths, cable loops, and pigtail lengths. Consult the application guide for
the product you are installing to help determine cable lengths.
●
Ensure that the blue tab on the shelf rail (directly above where the 1U Cable Management Tray rails will be installed) is
pressed in.
CL5504
Figure 38. Blue tab on rail must be pushed in
About this task
NOTE:
This procedure describes the installation of the 1U cable management tray into a standard Dell EMC rack. For third-
party racks, use the additional hardware that comes with the 1U cable management arm to install the rails as necessary.
The rails come preassembled with adapters that fit into standard round mounting holes. If the rack has a different configuration,
use the adapters in the hardware kit that come with the tray to mount the rails.
Steps
1. Identify the left and right rails. Orient the rails so that the UP arrow is pointed up and the end of the rails that are labeled
FRONT is at the front of the rack.
Install the Disk Shelves in the Rack
39
Содержание Data Domain DD9800
Страница 1: ...Dell EMC Data Domain DD9800 System Installation Guide September 2020 Rev 02 ...
Страница 65: ...Figure 66 DD9800 with ES30 shelves ERSO Connect Cables and Power On 65 ...
Страница 68: ...Figure 68 DD9800 with DS60 shelves DD9800 with HA For an HA DD9800 pair 68 Connect Cables and Power On ...
Страница 70: ...Figure 69 DD9800 with DS60 shelves HA 70 Connect Cables and Power On ...