DD9800 with HA (one rack)
For an HA DD9800 pair in one rack:
Table 12. DD9800 with ES30 HA primary node cabling instructions (one rack)
String
(Loop)
I/O - Port
Shelf Port
Length
1
I/O 3 - Port 1
B controller HOST
port of shelf V1.1
2M
1
I/O 2 - Port 0
A controller HOST
port of the highest number shelf in V1
2M
2
I/O 3 - Port 0
B controller HOST
port of shelf V2.1
2M
2
I/O 6 - Port 1
A controller HOST
port of the highest number shelf in V2
2M
3
I/O 2 - Port 1
B controller HOST
port of shelf V3.1
2M
3
I/O 6 - Port 0
A controller HOST
port of the highest number shelf in V3
2M
a.
Cable lengths shown are designed for Data Domain racks. Longer cables (up to 5M) can be used.
Table 13. DD9800 with ES30 HA standby node cabling instructions (one rack)
String
(Loop)
I/O - Port
Shelf Port
Length
1
I/O 3 - Port 1
A controller EXPANSION
port of shelf V1.1
2M
1
I/O 2 - Port 0
B controller EXPANSION
port of the highest number shelf in V1
2M
2
I/O 3 - Port 0
A controller EXPANSION
port of shelf V2.1
2M
2
I/O 6 - Port 1
B controller EXPANSION
port of the highest number shelf in V2
2M
3
I/O 2 - Port 1
A controller EXPANSION
port of shelf V3.1
2M
3
I/O 6 - Port 0
B controller EXPANSION
port of the highest number shelf in V3
2M
a.
Cable lengths shown are designed for Data Domain racks. Longer cables (up to 5M) can be used.
58
Connect Cables and Power On
Содержание Data Domain DD9800
Страница 1: ...Dell EMC Data Domain DD9800 System Installation Guide September 2020 Rev 02 ...
Страница 65: ...Figure 66 DD9800 with ES30 shelves ERSO Connect Cables and Power On 65 ...
Страница 68: ...Figure 68 DD9800 with DS60 shelves DD9800 with HA For an HA DD9800 pair 68 Connect Cables and Power On ...
Страница 70: ...Figure 69 DD9800 with DS60 shelves HA 70 Connect Cables and Power On ...