
1.1 About the Commissioning guidelines
1.1.2 Intended users of the Commissioning guidelines
1.1.5 List of technical documentation for GPU 300
1.2.1 Design, drawings and FAT test
1.2.2 Hot commissioning and retrofits
1.2.6 Safety during installation and operation
1.2.7 Shelving and taking alarms out of service
1.2.8 Do not manually override active alarm actions
2. Preparation for commissioning
2.2.1 Downloading and installing PICUS
2.3.5 Input/output and parameter configuration
3.1 BEFORE connecting the controller power supply
3.2.1 Connecting the controller power supply
3.2.2 Checking the controller LEDs
3.3.1 Plug and play connections in the network
3.3.2 Non-plug and play connections in the network
3.3.3 Checking the Ethernet connections
3.5 Controller software update
3.5.1 Connecting to a controller with PICUS
GPU 300 Commissioning guidelines 4189341033 UK
www.deif.com
Page 2 of 36