2. Preparation for commissioning
2.1 Tools
2.1.1 Tools required
The following tools are required for commissioning:
Tool
Used to
Safety equipment
Personal protection, according to local standards and requirements
Computer
Run PICUS
Ethernet cable
Connect the computer to the controller
PICUS
(The DEIF utility software)
• Configure the I/Os
• Configure the parameters
• Create CustomLogic
• Monitor operation (Live data)
See the
PICUS manual
for the system requirements to run PICUS.
DEIF supporters and other commissioning technicians have found these tools useful during controller commissioning:
Tool
Used to
Multimeter, with accessories and
spare batteries
Check wiring
Phase sequence meter
Check the phase sequence
Synchroscope
Check the synchronisation
Mirror or camera
Look into the areas above and below the rack
Torch (US: Flashlight)
Look at Ethernet cable wiring
Wire stripper, pliers and cutters
Change wiring
Trim cable ties
Screwdrivers
Change wiring
Swap hardware modules
See
Tools
in the
Installation instructions
for more information.
GPU 300 Commissioning guidelines 4189341033 UK
www.deif.com
Page 10 of 36