
6. Tilt the control panel.
7. Unfasten the 2 clamping collars on the air connection to dismantle
it.
8. Put the flue gas evacuation pipe in place.
n
Adapting the boiler to bottom outlet
WARNING
The boiler must be adapted to switch to a single flow
configuration (air/flue gas connection type B
23
- B
23P
)
(combustive air taken from the boiler room).
¼
Refer to the instructions delivered with the package MV9
5.7
Installing the outside sensor
5.7.1.
Choice of the location
It is important to select a place that allows the sensor to measure the
outside conditions correctly and effectively.
Advised positions:
4
on one face of the area to be heated, on the north if possible
4
half way up the wall in the room to be heated
4
under the influence of meteorological variations
4
protected from direct sunlight
4
easy to access
C003156-G
0 80
7
8
7
6
AFC 18 - AFC 24 - AFC 30
5. Installation
09/07/2015 - 300026439-07
57