6.3
Putting the appliance into operation
6.3.1.
Commissioning
CAUTION
Initial commissioning must be done by a qualified
professional.
CAUTION
After positioning the appliance, wait
one hour
before
starting it up.
Carry out the commissioning operations in the following order:
1. Connect to the mains.
2. Check that no error codes or messages are shown on the display.
The domestic hot water set point temperature is set to 55°C in
comfort mode.
3. Select the
Boost
operating mode.
¼
See chapter: "Choosing the operating mode", page 49
4. The compressor starts up after 120 seconds if DHW production is
required.
6.4
Checks and adjustments after commissioning
4
Check the leak tightness of the connections.
4
Check the temperature of the 3 DHW temperature sensors to
ensure that the appliance operates correctly.
If the readout values are incorrect, check the positioning of the
sensors in the sensor tube.
4
A few days after start up of the appliance, a visual inspection must
be made to check for any leaks in the water system or any
blockages in the condensates runoff.
6.5
Choosing the operating mode
The operating mode is shown on the main display.
1. To change the operating mode, press the
MODE
key several times
until the symbol corresponding to the desired operating mode
appears on the display.
C003493-B
1
4
3
4
1
2
TWH 200E TWH 300E TWH 300EH
6. Commissioning
19/01/2015 - 300026515-001-05
49
Содержание Kaliko TWH 200E
Страница 7: ...19 01 2015 300026515 001 05 5 ...
Страница 73: ...TWH 200E TWH 300E TWH 300EH 10 Spare parts 19 01 2015 300026515 001 05 71 ...
Страница 74: ...10 Spare parts TWH 200E TWH 300E TWH 300EH 72 19 01 2015 300026515 001 05 ...
Страница 75: ......