Accessing the menu
Menu
Description
6x
Installer parameters
For more information, see
Displaying the measured values, page 44
Measurements menu, page 44
Counters, page 45
Displaying the counters, page 45
Resetting the counters to zero, page 46
Log of messages and faults, page 59
Error display Err, page 60
Displaying lockouts bL, page 60
Resetting the lockout and error memory to zero, page 60
Modifying the installer parameters, page 47
Accessing the parameters, page 47
List of parameters, page 47
Control system sequence, page 49
Restoring the factory settings, page 50
6.2
Points to check before commissioning
1. Check that the thermodynamic water heater is full of water.
2. Check the tightness of the connections.
3. Check that the safety devices are working correctly.
4. Check the operating mode.
6.3
Commissioning the appliance
Caution
Initial commissioning must be performed by a qualified professio
nal.
Caution
After positioning the appliance, wait one hour before starting it up.
Carry out the commissioning operations in the following order:
1. Connect to the mains.
2. Check that no error codes or messages are shown on the display.
The domestic hot water temperature set point is factory-set to
55 °C in comfort mode.
3. Select the BOOST ( ) operating mode.
If domestic hot water production is required, the compressor starts
up after 120 seconds.
For more information, see
Selecting the operating mode, page 43
6.4
Checks and settings after commissioning
1. Check the tightness of the connections.
2. Check the temperature on the two domestic hot water temperature
sensors to ensure that the appliance is working correctly.
If the readout values are incorrect, check the positioning of the
sensors in the sensor tube.
3. A few days after commissioning of the appliance, carry out a visual
inspection to check for any leaks in the water system or any block
ages in the condensates run-off.
6.5
Selecting the operating mode
The operating mode is indicated on the main display.
6 Commissioning
300026515 - v09 - 25072017
43
Содержание KALIKO TWH 200 E
Страница 4: ...11 2 1 Specific information 68 Contents 4 300026515 v09 25072017 ...
Страница 55: ...No Date Checks made Remarks By Signature 8 Maintenance 300026515 v09 25072017 55 ...
Страница 69: ...11 Appendix 300026515 v09 25072017 69 ...
Страница 70: ...11 Appendix 70 300026515 v09 25072017 ...