5.9.6
Connection with timer programming and photovoltaic sig
nal
Fig.32
C004822-B
A
TEST
16 A
40 A
2 A
30
mA
L
N
X11-2 HP/H
PV-S
DC
AC
X11-1 LINE
C
3
5
6
4
4
3 AC-type differential switch
4 Circuit breaker
5 Photovoltaic panel
6 Reversible
A 1.5 mm
2
voltage cable
1. The heat pump and the electrical back-up are authorised to operate
according to the timer programming.
2. When the photovoltaic signal is active, the tank set point is 62°C,
and can be adjusted via the parameter
.
3. If the photovoltaic signal is active when the contact is open, set the
parameter
to 3.
4. If the photovoltaic signal is active when the contact is closed, set the
parameter
to 4.
5 Installation
38
300026515 - v09 - 25072017
Содержание KALIKO TWH 200 E
Страница 4: ...11 2 1 Specific information 68 Contents 4 300026515 v09 25072017 ...
Страница 55: ...No Date Checks made Remarks By Signature 8 Maintenance 300026515 v09 25072017 55 ...
Страница 69: ...11 Appendix 300026515 v09 25072017 69 ...
Страница 70: ...11 Appendix 70 300026515 v09 25072017 ...