![DeDietrich IX 145-110 Скачать руководство пользователя страница 69](http://html1.mh-extra.com/html/dedietrich/ix-145-110/ix-145-110_installation-and-service-manual_2462473069.webp)
5. Remount the connection pipe to the gas valve
Tab.48 Torque load
Reference
Model
Fastening Venturi end
Fastening gas valve end
A
IX 145–50
Clip
G1” nut, torque: 40 N·m
B
IX 145–70
IX 145–90
IX 145–110
Nut, Torque: 40 N·m
Nut, Torque: 40 N·m
6. Open the mains gas valve.
7. Check the tightness of the assembly and ensure that there are no
leaks.
8. Set the gas valve according to the parameters given in the conversion
kit manual.
9. Set the fan speed according to the new gas type.
10. Set the air/gas ratio.
11. Replace the gas setting label with the one delivered with the boiler
and tick the corresponding gas setting.
For more information, see
CO2 checking and setting values, page 65
Setting the air/gas ratio (reduced heat input), page 63
Setting the air/gas ratio (maximum heat input), page 61
8 Commissioning
7702703 - v04 - 05092019
IX
69
Содержание IX 145-110
Страница 130: ...15 Disposal recycling 130 IX 7702703 v04 05092019 ...