![DeDietrich IX 145-110 Скачать руководство пользователя страница 45](http://html1.mh-extra.com/html/dedietrich/ix-145-110/ix-145-110_installation-and-service-manual_2462473045.webp)
6. Remove the detachable panel if necessary.
See
The disassembly instructions can be found on the detachable
panel.
7.3
Hydraulic connections
7.3.1
Connection of the heating circuit
Abide by the mountings shown in the hydraulic diagrams.
Caution
The heating pipe must be mounted in accordance with the
provisions applicable.
If installing stop valves, position the fill/drain valve and the
expansion vessel between the stop valves and the boiler.
Always install a safety valve calibrated to 4 bar on the heating
circuit. The safety valve can be connected to a venting pot. The
safety valve must not be used to drain the heating circuit.
See
If using a hydraulic kit (low-loss header, plate heat exchanger,
cascade kit), use the assembly instructions for the kit.
Important
The pipes are not provided.
1. Remove the anti-dust plug located on the boiler's "heating flow" outlet.
2. Connect the "heating circuit flow" pipe to the "heating flow" outlet on
the boiler.
Fig.43
MW-3000026-02
6
Fig.44
M
W
-3
0
0
0
0
2
8
1
2
7 Installation
7702703 - v04 - 05092019
IX
45
Содержание IX 145-110
Страница 130: ...15 Disposal recycling 130 IX 7702703 v04 05092019 ...