4.4
Installing the mounting frame
The boiler is delivered with a mounting template.
1. Position the mounting template to the wall with adhesive tape.
CAUTION
Using a spirit level, check that the mounting axis is
perfectly horizontal.
2. Drill 3 holes with a Ø of 10 mm.
Additional holes are provided in case one or other of the
standard locating holes prevents the correct location of the
plugs.
3. Put the plugs in place.
4. Secure the mounting frame to the wall using the 3 hexagonal
headed screws provided for this purpose.
T001869-A
1
2
3
4
4. Installation
MCA 15 - MCA 25 MCA 25/28 MI
20
29/04/2010 - 300022146-001-B
Содержание Innovens MCA 15
Страница 7: ...29 04 2010 300022146 001 B 5...
Страница 141: ...MCA 15 MCA 25 MCA 25 28 MI 9 Spare parts 29 04 2010 300022146 001 B 139...
Страница 142: ...9 Spare parts MCA 15 MCA 25 MCA 25 28 MI 140 29 04 2010 300022146 001 B...
Страница 143: ......