6.10 Service Request Display

 
This led is designed to help the periodic maintenance of the genset to be made consistently.
The periodic maintenance is basically carried out after a given engine hours (for example 200 

hours), but even if this amount of engine hours is not fulfilled, it is performed after a given time limit (for 
example 12 months).  

 

 

The SERVICE REQUEST led 
operation.

 

 

The unit has both programmable engine hours and maintenance time limit. The engine hours is 

programmable  with  50-hour  steps,  the  time  limit  is  programmable  with  1
programmed values is zero, this means that the parameter will not be used. For example a maintenance 
period of 0 months indicates that the 
be  no  time  limit.  If  the  engine  hours  is  also  selected  as  0  hours  this  will  mean  that  the  SERVICE 
REQUEST display will be inoperative.
 

When the engine hours 

OR

flash and the service request relay function will be a

The service request relay function may be assigned to spare relays using 

program parameters. Also relays on an extension module may be assigned to this function.

 

 

To turn off the 
period, press together the ALARM MUTE and LAMP TEST keys 
for 5 seconds.

 

The remaining engine hours and the remaining time limit are kept stored in a non

and are not affected from power supply failures. 

 

 

The time and engine hours to service 

 

6.11 Engine Hour Meter

 
The unit features a non-erasable incremental engine hour meter. The hour meter information is 

kept in a non-volatile memory and is not 

 

 

The engine hours may be displayed 

 

 

                                                                              

 

Service Request Display 

This led is designed to help the periodic maintenance of the genset to be made consistently.
The periodic maintenance is basically carried out after a given engine hours (for example 200 

hours), but even if this amount of engine hours is not fulfilled, it is performed after a given time limit (for 

The SERVICE REQUEST led has no effect on the genset 

The unit has both programmable engine hours and maintenance time limit. The engine hours is 

hour  steps,  the  time  limit  is  programmable  with  1  month 

programmed values is zero, this means that the parameter will not be used. For example a maintenance 

indicates that the unit will request maintenance only based on engine hours

gine  hours  is  also  selected  as  0  hours  this  will  mean  that  the  SERVICE 

REQUEST display will be inoperative. 

OR

 the time limit is over, the 

SERVICE REQUEST

flash and the service request relay function will be active. 

The service request relay function may be assigned to spare relays using 

program parameters. Also relays on an extension module may be assigned to this function.

To turn off the SERVICE REQUEST led, and reset the service 

press together the ALARM MUTE and LAMP TEST keys 

for 5 seconds.

  

The remaining engine hours and the remaining time limit are kept stored in a non

power supply failures.  

The time and engine hours to service are displayed in the 

STATISTICAL COUNTERS

Engine Hour Meter 

erasable incremental engine hour meter. The hour meter information is 

volatile memory and is not affected from power supply failures.  

The engine hours may be displayed 

STATISTICAL COUNTERS

  menu. 

 

                      V-02 

 

 

- 18 -

This led is designed to help the periodic maintenance of the genset to be made consistently. 
The periodic maintenance is basically carried out after a given engine hours (for example 200 

hours), but even if this amount of engine hours is not fulfilled, it is performed after a given time limit (for 

has no effect on the genset 

The unit has both programmable engine hours and maintenance time limit. The engine hours is 

month  steps.  If  any  of  the 

programmed values is zero, this means that the parameter will not be used. For example a maintenance 

will request maintenance only based on engine hours, there will 

gine  hours  is  also  selected  as  0  hours  this  will  mean  that  the  SERVICE 

SERVICE REQUEST

 led (red) will start to 

The service request relay function may be assigned to spare relays using 

Relay Definition

 

program parameters. Also relays on an extension module may be assigned to this function. 

led, and reset the service 

press together the ALARM MUTE and LAMP TEST keys 

The remaining engine hours and the remaining time limit are kept stored in a non-volatile memory 

STATISTICAL COUNTERS

  menu. 

erasable incremental engine hour meter. The hour meter information is 

Содержание DKG-309

Страница 1: ...ging with date time stamp and complete measurement values Stores last 250 events Statistical counters Battery backed up real time clock Weekly operation schedule programs Programmable parameters All p...

Страница 2: ...d Mains Simulation Battery Charging 6 9 Dual Genset Mutual Standby Operation 6 10 Service Request Display 6 11 Engine Hours Meter 6 12 Date Time Display 6 13 Display of Software Version 6 14 Modem con...

Страница 3: ...e stored in a Non Volatile Memory and thus all information is retained even in the event of complete loss of power The measured parameters are Mains voltage phase L1 to neutral Mains voltage phase L2...

Страница 4: ...ach transformer to related inputs Never use common terminals or grounding The power rating of the transformer should be at least 5 VA It is recommended to s e g temperature oil pressure or fuel level...

Страница 5: ...nerator phases 6 MAINS NEUTRAL Input 0 300V AC Neutral terminal for the mains phases 7 MAINS L3 Mains phase inputs 0 300V AC Connect the mains phases to these inputs The mains voltages upper and lower...

Страница 6: ...elected via the program menu Each input may be driven by a normally closed or normally open contact switching either battery or battery The effect of the switch is also selectable from a list See PROG...

Страница 7: ...the programmed limits LOAD TEST Yellow It turns on when the related operation mode is selected One of these LEDs is always on and indicates which operation mode is selected If the operation of the gen...

Страница 8: ...ation between different screens s made with the MENU and MENU buttons Each depression of the MENU button switches the display to the next screen Each depression of the MENU button switches the display...

Страница 9: ...ttery Voltage Fuel Level 6 Complete Genset parameters phase to neutral Genset status Genset Volts L1 Genset Volts L2 Genset Volts L3 Genset Current L1 Genset Current L2 Genset Current L3 Genset Freque...

Страница 10: ...ion Date and time Operating software version 13 Statistical Counters 1 3 Engine Hours Run Total Genset Active Power KW h 14 Statistical Counters 2 3 Engine Hours to Service Time to Service 15 Statisti...

Страница 11: ...ion of the genset The existing alarms may be canceled by pressing one of the operating mode buttons LOAD TEST TEST OFF AUTO Most of the alarms have programmable trip levels See the programming chapter...

Страница 12: ...er This fault will be monitored with holdoff timer delay after the engine is running GENSET HIGH VOLTAGE Set if any of the generator phase voltages goes outside programmed limits for Overload Timer Th...

Страница 13: ...edule then the AUTO led will flash and the operation of the genset will be as in the OFF mode TEST It is used to test the generator when the mains are on or keep the generator running in the emergency...

Страница 14: ...ion The Fuel Level Sender Ohms is also programmable 6 3 Engine Heating Operation Especially on engines without a body heater or with a failing one it may be desired that the genset should not take the...

Страница 15: ...ters Also relays on an extension module may be assigned to this function The engine body temperature limit is adjusted using the parameter Engine Heating Temperature The same parameter is used for eng...

Страница 16: ...n both parameters Remote Start Operation and are set then REMOTE START operation mode is performed 8 Delayed Mains Simulation Battery Charging s Simulation feature is used in battery backed up telecom...

Страница 17: ...ching of the load between 2 gensets The use of 2 gensets instead of one is due either to safety purposes in case of a genset failure or to a continuous operation requesting service stops The running p...

Страница 18: ...month programmed values is zero this means that the parameter will not be used For example a maintenance indicates that the unit will request maintenance only based on engine hours gine hours is also...

Страница 19: ...cable network PSTN If the modem is connected to the unit the Modem Enable program parameter should be set to 1 otherwise faulty operation may occur If Modem Enable or SMS Enable or MODBUS Address par...

Страница 20: ...ges Any new upcoming alarm will result in a new GSM SMS message The new message will indicate all existing alarms even masked ones The necessary GSM modem cable will be supplied by DATAKOM This is the...

Страница 21: ...d hour Exercise off_load on_load Daily Weekly Monthly Please refer to the programming section for a more detailed description of the above When the start day and hour of exercise has come the unit wil...

Страница 22: ...d function consists on the connection of a dummy load if the total genset load is below a limit and to disconnection of the dummy load when the total power exceeds another limit The dummy load functio...

Страница 23: ...R W DATA SIZE COEFFICIENT DESCRIPTION 0000 R 16bit x1 Mains Phase L1 voltage 0001 R 16bit x1 Mains Phase L2 voltage 0002 R 16bit x1 Mains Phase L3 voltage 0003 R 16bit x1 Genset Phase L1 voltage 0004...

Страница 24: ...d in 10 minute steps Unused programs should be set to 24 00 An example setup may be as follows Monday Turn_on 07 00 Monday Turn_off 18 00 Tuesday Turn_on 07 00 Tuesday Turn_off 18 00 Wednesday Turn_on...

Страница 25: ...sured values are stored within the The events are recorded with a time stamp which comes from the internal real time The events are stored in a circular memory This means that a new coming event will...

Страница 26: ...unit if necessary with a soft damp cloth Do not use chemical agents STATISTICAL COUNTERS The unit provides a set of non resettable incremental counters for statistical purposes These counters are kept...

Страница 27: ...e made with and buttons Selected group is shown in reverse video blue on white In order to enter inside a group please press MENU button In order to exit from the group to the main list please press M...

Страница 28: ...RM relay is active If the period is set to 0 this will mean that the period is unlimited Intermittent Alarm Relay 0 0 continuous 1 intermittent turns on and off every second Charge Alternator Shutdown...

Страница 29: ...port is connected to PC 1 Modem connected SMS Enable 0 0 SMS not enabled 1 SMS enabled GPRS Call Enable 0 0 standard modem calls 1 GPRS modem calls MODBUS Address 0 0 RAINBOW communication protocol 1...

Страница 30: ...vercurrent check is disabled Excess Power Limit KW 0 If the active power goes above this limit during the period defined in Overload Timeout then an Excess Power Load Dump alarm will be generated If t...

Страница 31: ...entered within the limits and the generator contactor is deactivated Genset Contactor Timer sec 1 This is the period after the mains contactor has been deactivated and before the generator contactor h...

Страница 32: ...EMPERATURE SENDER warning High Temperature Shutdown C 98 f the coolant temperature measured from the analog input goes over this limit this will generate a HIGH TEMPERATURE SENDER alarm and the engine...

Страница 33: ...0 engine is heated during Engine Heating Timer 1 engine is heated until the coolant temperature reaches the Engine Heating Temperature and at least during the Engine Heating Timer Service Engine Hours...

Страница 34: ...Turn_off 24 00 Sunday Turn_on 24 00 Sunday Turn_off 24 00 Program Group Sender Characteristics Parameter Definition Unit Factory Set Description Oil Pressure Sender Ohms 1 ohm 10 Oil Pressure Sender...

Страница 35: ...Temperature Sender point 2 C value Temperature Sender Ohms 3 ohm 134 Temperature Sender point 3 ohm value Temperature Value 3 C 60 Temperature Sender point 3 C value Temperature Sender Ohms 4 ohm 322...

Страница 36: ...lly open 1 Normally closed Switching 0 0 Battery negative 1 Battery positive Response delay 0 0 No delay 1 Delayed 4sec Program Group Input Configuration High Temperature Switch Parameter Definition U...

Страница 37: ...e engine stops immediately 1 Load Dump the engine stops after cooldown 2 Warning the horn relay operates 3 No operation Sampling 2 0 Always 1 After holdoff timer 2 When mains present Latching 1 0 Non...

Страница 38: ...e stops immediately 1 Load Dump the engine stops after cooldown 2 Warning the horn relay operates 3 No operation Sampling 0 0 Always 1 After holdoff timer 2 When mains present Latching 0 0 Non latchin...

Страница 39: ...ected from list Relay 06 Definition 5 RELAY 6 function expansion module 1 selected from list Relay 07 Definition 0 RELAY 7 function expansion module 1 selected from list Relay 08 Definition 2 RELAY 8...

Страница 40: ...p sender alarm 42 Low speed alarm 43 High speed alarm 44 Low voltage alarm 45 High voltagealarm 46 Fail to start alarm 47 Low fuel sender alarm 48 49 50 51 High battery voltage alarm 52 Charge fail al...

Страница 41: ...r in order to enable dialing through a pabx Program Group Modem 2 SMS 1 Telephone Number Parameter Definition Factory Set Description Modem 2 SMS 1 telephone number This telephone number buffer accept...

Страница 42: ...Genset Voltage L1 Calibration 760 Adjusts the measurement of genset voltage of phase L1 Genset Voltage L2 Calibration 760 Adjusts the measurement of genset voltage of phase L2 Genset Voltage L3 Calib...

Страница 43: ...frequency displayed on the unit are not correct Check engine body grounding it is necessary The error margin of the unit is 3 volts If there are faulty measurements only when the engine is running the...

Страница 44: ...an auxiliary relay The coil of the relay will be between BATTERY and charging alternator D terminal The normally closed contact of the relay will be connected serially to the unit s START output So th...

Страница 45: ...e EU directives 2006 95 EC low voltage 2004 108 EC electro magnetic compatibility Norms of reference EN 61010 safety requirements EN 61326 EMC requirements The CE mark indicates that this product comp...

Страница 46: ...10 to 30 VDC Current inputs from current transformers 5A Max load 0 7VA per phase Digital inputs input voltage 0 30 VDC Internally connected to battery positive via 4700 ohm resistor Analog inputs Re...

Страница 47: ...DKG 309 User Manual V 02 11 05 2009 47 15 CONNECTION DIAGRAM...

Страница 48: ...ERROR stackunderflow OFFENDING COMMAND STACK...

Отзывы: