![Data I/O PSV7000 Скачать руководство пользователя страница 25](http://html.mh-extra.com/html/data-i-o/psv7000/psv7000_operators-manual_511176025.webp)
■ Running a Job on PSV7000 ◘ Installing Input/Output Media
PSV7000 Operator’s Manual
—21—
back
Vibration Tube Input Option—Loading
With the Tube Vibration System set up and Input/Output platforms
already installed, insert tubes and adjust action as described below.
Requirements
• Metric hex key set
• Empty tubes for the output platform
1.
Insert
full
tubes into the input tube module and adjust the
guides. (The input platform is on the left.)
2.
Insert
empty
tubes into the output tube module and adjust the
guides.
Note:
The Tube Feeder communication cable must be plugged into
the correct connector on the front panel of the PSV7000: Input
Vibration Module plugs into the left connector; Output Module
into the right connector.
Note:
Make sure that the correct devices for the target job are
loaded into the input tray and that they have the correct pin 1 ori-
entation. (If pin 1 orientation doesn’t match pin 1 that is set in the
Package File it must be corrected).
Pin 1 on Data I/O sockets is almost always toward the far side of
the Socket Adapter (the back of the machine).
Figure 8: Three tubes for input are installed in this view.
3.
Close the safety door.
4.
Turn the power switch ON at both the Vibrator Input Module
and Output Module.
Remember:
• The
Setup
window >
Options
tab must be set to match the work-
space setup. Refer to the AH700 on-screen Help.
For Tube Feeder Installa-
tion, see the PSV7000
Owner’s Manual; includes
cutting a notch in the
tubes for picking and
placing devices.
On the AH700 Gantry
window, the Tube Feeders
are represented by the
yellow position labels
that reads Vib1 and
Vib2.
Содержание PSV7000
Страница 82: ...Operation My Notes 78 Data I O 096 0461 001G back My Notes ...
Страница 86: ...Index 82 Data I O 096 0461 001G ...
Страница 88: ...www dataio com www dataio de www datio cn ...