■ Running a Job on PSV7000 ◘
PSV7000 Operator’s Manual
—17—
back
1» Checking the System
Before you set up for your job, check that:
• All side panels and doors are closed and no one is working on
the machine.
• The external air line is connected.
Note:
If the power and air pressure switches are already ON, the
pressure indicator number should be green.
PSV7000 Machines must
be level and at room
temperature before run-
ning a job.
Содержание PSV7000
Страница 82: ...Operation My Notes 78 Data I O 096 0461 001G back My Notes ...
Страница 86: ...Index 82 Data I O 096 0461 001G ...
Страница 88: ...www dataio com www dataio de www datio cn ...