
5. Commissioning / Shut-down Procedure
36
OM Hydraulic aggregate, Version 1.0 01/2013
Hydraulic connection
Direct connection
Once switched off and depressurised, remove the lock nuts and plugs from the
screwed insert and fit the hose.
1
Distributor block
2
High pressure connection
3
Low pressure connection
4
Pressure gauge
Fig. 5-1
Direct connection
Содержание BP2
Страница 1: ...English 6000 0509 00 Product Manual Hydraulic Aggregate 2 Translation of the original product manual...
Страница 20: ...Appendix A Signature List 14 IM Hydraulic Aggregate 2 Version 1 0 01 2013...
Страница 21: ...English 6000 0509 00 Operation Manual Hydraulic Aggregate 2 Translation of the original operation manual...
Страница 77: ...10 Technical Data OM Hydraulic Aggregate Version 1 0 01 2013 53 Empty page...