The duct assembly is used to mark the bottom
cut-out. Temporarily install the bottom duct
work as shown to the right. Use the inside of
the duct work to mark the bottom of the en-
closure for the opening.
3.54: Temporarily install the duct work to mark
the cut-out on the gland.
The cut-out is made on the innermost gland
plate. The remaining two gland plates must be
removed for the installation of the bottom
duct assembly.
3.55: Enclosure bottom cut-out
3.56: Bottom duct work installed
The bottom duct work is rotated into place as shown. The bottom ductwork is a tight fit by design.
The upper part of the duct fits under the bottom duct adapter and requires a tight fit, which, with
the gasket material, maintains the IP 54 and UL and NEMA 12 rating.
3. How to Install
VLT
®
HVAC DRIVE High Power
Instruction Manual
44
MG.11.F1.22 - VLT
®
is a registered Danfoss trademark.
3
Содержание FC 100 Series
Страница 131: ...7 Annexes VLT HVAC DRIVE High Power Instruction Manual 7 Annexes MG 11 F1 22 VLT is a registered Danfoss trademark 131 7...
Страница 133: ...VLT HVAC DRIVE High Power Instruction Manual 7 Annexes MG 11 F1 22 VLT is a registered Danfoss trademark 133 7...
Страница 134: ...7 Annexes VLT HVAC DRIVE High Power Instruction Manual 134 MG 11 F1 22 VLT is a registered Danfoss trademark 7...
Страница 135: ...VLT HVAC DRIVE High Power Instruction Manual 7 Annexes MG 11 F1 22 VLT is a registered Danfoss trademark 135 7...