68 |
3. Preparing for installation
The machine must be installed on a surface that guarantees a safe and stable
support. When preparing the installation site, provide an at least 10x10 cm
opening A (Fig.1) on the support surface to enable the connections with the
necessary utilities in the space below B (Fig.1).
The machine must be exclusively supplied with cold drinkable water in
compliance with all national regulations.
The water pressure must range between 0.1 and 0.6 MPa. In the absence
of the last requirement, contact the manufacturer for further instructions.
A shut-off valve 1 (Fig.1) must be installed between the water supply and
the machine's water supply inlet so as to easily interrupt the water supply
if necessary.
Connect the drain siphon 5 (Fig.1), with a minimum diameter of 40 mm, to
the drain of the installation premises.
The equipment is supplied without a plug as it is to be installed in a fixed
manner to the electrical network. Therefore an omnipolar switch 7 (Fig.1)
must be provided for in compliance with all regulations and standards in
force.