Dakewe (Shenzhen) Medical Equipment Co., Ltd
85
8.1.2.2 Shortcut key startup
Click the assigned shortcut program button. The sample placement confirmation
window pops up. After confirmation, click “Next”.
The cassette quantity window pops up. After entering the number of cassettes, click
“Next”.
Select the number of tissue sample baskets. Click “Next”.
Set the program end time: Check “Immediate Start”. Click “Run” to directly start
the dehydration program.
Or, after checking “Delay Start”, click the “Edit Appointment Time” button
(Figure
77-2)
to enter the appointment setting interface of the program end time
(Figure 77-3)
.
After completing the settings in order, click “OK” to exit. Click the “Run” button
afterwards. The system will calculate the time that needs to be delayed. The staining
program is automatically started when the time arrives.
During the program operation, do not open the dehydration cylinder lid, or pull out the
reagent bottle / paraffin case door / paraffin cylinder, which may damage the instrument
or trigger an error report.
8.2 Program Operation Panel
The interface panel during the program operation is shown in the figure below.
The extraction and discharge process of the site in the current step is displayed on the left
side of the interface
(Figure 78-1)
.
The program name, expected completion time, number of cassettes, current step, remaining
time of the step and other information are displayed on the right side of the interface
(Figure
78-2)
.
Click the “Progress Details” button to view further details
(Figure 78-3)
.
Figure 78
Содержание HP300 Plus
Страница 1: ...HP300 Plus Automatic Tissue Processor User s Manual Revision V1 4 English Version Jan 2023...
Страница 21: ...Dakewe Shenzhen Medical Equipment Co Ltd 17 necessary...
Страница 67: ...Dakewe Shenzhen Medical Equipment Co Ltd 63 Figure 56...
Страница 96: ...92 Dakewe Shenzhen Medical Equipment Co Ltd...