Error Codes: Outdoor Units
ESIE05-03
3–60
Part 3 – Troubleshooting
3
1
3
4
5
Troubleshooting
Caution
Be sure to turn off power switch before connect or disconnect connector, or parts damage may be
occurred.
Replace HPS with no
continuity.
Turn off the power supply.
Wait for 10 minutes after
compressor stops operating,
then check the following.
Is
there
continuity in
control and
protection
HPS?
Correct the high pressure.
Replace the outdoor unit
PC board.
Replace the high pressure
switch (HPS).
NO
YES
Connect correctly.
Are
control and
protection HPS
connected to outdoor unit
PC board?
(Note)
NO
YES
Open the stop valve.
NO
YES
Set the remote controller and
turn on again.
Is the
malfunction code of “H3”
displayed?
YES
NO
Is high pressure
abnormally high?
YES
NO
Check the installation
conditions.
Is the
stop valve open?
Check 5.7
ESIE05-03.book Page 60 Wednesday, April 6, 2005 4:09 PM
Содержание RZQ100B7W1B
Страница 1: ...Service Manual ESIE05 03 RZQ71 125B8V3B RZQ100 140B7W1B Sky Air Inverter R 410A B series...
Страница 2: ......
Страница 10: ...ESIE05 03 viii Table of Contents 3 1 4 5...
Страница 24: ...ESIE05 03 1 2 Part 1 System Outline 3 1 1 5...
Страница 32: ...General Outline Outdoor Units ESIE05 03 1 10 Part 1 System Outline 3 1 1 4 5...
Страница 42: ...Specifications ESIE05 03 1 20 Part 1 System Outline 3 1 1 4 5...
Страница 56: ...Functional Diagrams ESIE05 03 1 34 Part 1 System Outline 3 1 1 4 5...
Страница 58: ...ESIE05 03 1 36 Part 1 System Outline...
Страница 70: ...Wiring Diagrams ESIE05 03 1 48 Part 1 System Outline 3 1 1 4 5...
Страница 84: ...PCB Layout ESIE05 03 1 62 Part 1 System Outline 3 1 1 4 5...
Страница 86: ...ESIE05 03 2 2 Part 2 Functional Description 3 1 2 5...
Страница 110: ...General Functionality ESIE05 03 2 26 Part 2 Functional Description 3 1 2 4 5...
Страница 150: ...ESIE05 03 3 2 Part 3 Troubleshooting 3 1 3 5...
Страница 188: ...Troubleshooting ESIE05 03 3 40 Part 3 Troubleshooting 3 1 3 4 5...
Страница 264: ...Additional Checks for Troubleshooting ESIE05 03 3 116 Part 3 Troubleshooting 3 1 3 4 5...
Страница 266: ...ESIE05 03 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Страница 306: ...ESIE05 03 5 2 Part 5 Disassembly and Maintenance 3 1 5...
Страница 320: ...Disassembly and Maintenance Outdoor Units ESIE05 03 5 16 Part 5 Disassembly and Maintenance 3 1 5 5...