ESIE05-03
Outdoor Unit Functional Concept
Part 2 – Functional Description
2–59
3
2
4
5
1
3.4.1
Expansion Valve Control at Startup
Outline
Before going to the general expansion valve control, the expansion valve opening will be limited in
order to avoid the risk of liquid back and allow quick build up of pressure difference.
Details
During startup, the opening degree is determined by both the compressor frequency & the suction
superheat. During startup, it is not possible to use only the value of the suction superheat because the
operation is not stable yet. As a consequence also the SH value will not be stable.
Graph
Expansion valve
opening during
pressure
equalization
On RZQ71 units (using double swing compressor) the expansion valve will be fully opened (to 480
pulses) for pressure equalisation before compressor start-up. Just before compressor start up, the
expansion valve opening will be set to 65 pulses, same as for the 100~140 class.
Ending condition
The starting control will be terminated when the low pressure value < 6 bar or when the maximum
starting time of 10 minutes has been reached in case the low pressure value stays > 6 bar.
Compressor
Motorized valve
Pressure equalizing
control before
compressor start
Pressure
equalizing
start
Pressure
equalizing
complete
Starting
control
complete
Starting control
RZQ71: 73 Hz
RZQ100 & 125: 107 Hz
RZQ71: 480 pls
RZQ100~140:
65 pls
15 s
ESIE05-03.book Page 59 Wednesday, April 6, 2005 4:09 PM
Содержание RZQ100B7W1B
Страница 1: ...Service Manual ESIE05 03 RZQ71 125B8V3B RZQ100 140B7W1B Sky Air Inverter R 410A B series...
Страница 2: ......
Страница 10: ...ESIE05 03 viii Table of Contents 3 1 4 5...
Страница 24: ...ESIE05 03 1 2 Part 1 System Outline 3 1 1 5...
Страница 32: ...General Outline Outdoor Units ESIE05 03 1 10 Part 1 System Outline 3 1 1 4 5...
Страница 42: ...Specifications ESIE05 03 1 20 Part 1 System Outline 3 1 1 4 5...
Страница 56: ...Functional Diagrams ESIE05 03 1 34 Part 1 System Outline 3 1 1 4 5...
Страница 58: ...ESIE05 03 1 36 Part 1 System Outline...
Страница 70: ...Wiring Diagrams ESIE05 03 1 48 Part 1 System Outline 3 1 1 4 5...
Страница 84: ...PCB Layout ESIE05 03 1 62 Part 1 System Outline 3 1 1 4 5...
Страница 86: ...ESIE05 03 2 2 Part 2 Functional Description 3 1 2 5...
Страница 110: ...General Functionality ESIE05 03 2 26 Part 2 Functional Description 3 1 2 4 5...
Страница 150: ...ESIE05 03 3 2 Part 3 Troubleshooting 3 1 3 5...
Страница 188: ...Troubleshooting ESIE05 03 3 40 Part 3 Troubleshooting 3 1 3 4 5...
Страница 264: ...Additional Checks for Troubleshooting ESIE05 03 3 116 Part 3 Troubleshooting 3 1 3 4 5...
Страница 266: ...ESIE05 03 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Страница 306: ...ESIE05 03 5 2 Part 5 Disassembly and Maintenance 3 1 5...
Страница 320: ...Disassembly and Maintenance Outdoor Units ESIE05 03 5 16 Part 5 Disassembly and Maintenance 3 1 5 5...