Troubleshooting
ESIE05-03
3–24
Part 3 – Troubleshooting
3
1
3
4
5
Troubleshooting
Caution
Be sure to turn off power switch before connect or disconnect connector, or parts damage may be
occurred.
Is the
limit switch’s
transfer connector
correctly
connected?
Does the flap swing?
Are the
connectors correctly
connected to X29A and
X14A on the
PC board?
Is continuity/no
continuity reversed?
220 - 240 VAC?
Turn the power supply off once
and back on, and measure the
output voltage of connector
X29A when the power supply is
turned back on.
Disconnect X14A, turn the
power supply off once and back
on, and check if the limit switch
has continuity when the power
supply it turned back on.
Turn the power supply off once
and back on, and check whether
the swing flap motor swings
when the power supply is turned
back on.
YES
NO
NO
YES
YES
YES
NO
NO
YES
NO
Connect correctly.
Connect correctly.
Replace the indoor unit
PC board.
Replace the swing
motor assembly.
ESIE05-03.book Page 24 Wednesday, April 6, 2005 4:09 PM
Содержание RZQ100B7W1B
Страница 1: ...Service Manual ESIE05 03 RZQ71 125B8V3B RZQ100 140B7W1B Sky Air Inverter R 410A B series...
Страница 2: ......
Страница 10: ...ESIE05 03 viii Table of Contents 3 1 4 5...
Страница 24: ...ESIE05 03 1 2 Part 1 System Outline 3 1 1 5...
Страница 32: ...General Outline Outdoor Units ESIE05 03 1 10 Part 1 System Outline 3 1 1 4 5...
Страница 42: ...Specifications ESIE05 03 1 20 Part 1 System Outline 3 1 1 4 5...
Страница 56: ...Functional Diagrams ESIE05 03 1 34 Part 1 System Outline 3 1 1 4 5...
Страница 58: ...ESIE05 03 1 36 Part 1 System Outline...
Страница 70: ...Wiring Diagrams ESIE05 03 1 48 Part 1 System Outline 3 1 1 4 5...
Страница 84: ...PCB Layout ESIE05 03 1 62 Part 1 System Outline 3 1 1 4 5...
Страница 86: ...ESIE05 03 2 2 Part 2 Functional Description 3 1 2 5...
Страница 110: ...General Functionality ESIE05 03 2 26 Part 2 Functional Description 3 1 2 4 5...
Страница 150: ...ESIE05 03 3 2 Part 3 Troubleshooting 3 1 3 5...
Страница 188: ...Troubleshooting ESIE05 03 3 40 Part 3 Troubleshooting 3 1 3 4 5...
Страница 264: ...Additional Checks for Troubleshooting ESIE05 03 3 116 Part 3 Troubleshooting 3 1 3 4 5...
Страница 266: ...ESIE05 03 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Страница 306: ...ESIE05 03 5 2 Part 5 Disassembly and Maintenance 3 1 5...
Страница 320: ...Disassembly and Maintenance Outdoor Units ESIE05 03 5 16 Part 5 Disassembly and Maintenance 3 1 5 5...