ESIE05-03
Introduction
ix
3
4
5
P
Differences
•
Change of dimension A
Conventional flaring tools can be used when the work process is changed. (change of work process)
Previously, a pipe extension margin of 0 to 0.5mm was provided for flaring. For R410A air
conditioners, perform pipe flaring with a pipe extension margin of 1.0 to 1.5 mm. (For clutch type only)
Conventional tool with pipe extension margin adjustment can be used.
Torque wrench
P
Specifications
•
Dimension B
Unit:mm
No change in tightening torque
No change in pipes of other sizes
P
Differences
•
Change of dimension B
Only 1/2", 5/8" are extended
Dimension A
For class-1: R407C
For class-2: R410A
Nominal size
Class-1
Class-2
Previous
1/2
24
26
24
5/8
27
29
27
For class-1: R407C
For class-2: R410A
Dimension B
ESIE05-03.book Page ix Wednesday, April 6, 2005 4:09 PM
Содержание RZQ100B7W1B
Страница 1: ...Service Manual ESIE05 03 RZQ71 125B8V3B RZQ100 140B7W1B Sky Air Inverter R 410A B series...
Страница 2: ......
Страница 10: ...ESIE05 03 viii Table of Contents 3 1 4 5...
Страница 24: ...ESIE05 03 1 2 Part 1 System Outline 3 1 1 5...
Страница 32: ...General Outline Outdoor Units ESIE05 03 1 10 Part 1 System Outline 3 1 1 4 5...
Страница 42: ...Specifications ESIE05 03 1 20 Part 1 System Outline 3 1 1 4 5...
Страница 56: ...Functional Diagrams ESIE05 03 1 34 Part 1 System Outline 3 1 1 4 5...
Страница 58: ...ESIE05 03 1 36 Part 1 System Outline...
Страница 70: ...Wiring Diagrams ESIE05 03 1 48 Part 1 System Outline 3 1 1 4 5...
Страница 84: ...PCB Layout ESIE05 03 1 62 Part 1 System Outline 3 1 1 4 5...
Страница 86: ...ESIE05 03 2 2 Part 2 Functional Description 3 1 2 5...
Страница 110: ...General Functionality ESIE05 03 2 26 Part 2 Functional Description 3 1 2 4 5...
Страница 150: ...ESIE05 03 3 2 Part 3 Troubleshooting 3 1 3 5...
Страница 188: ...Troubleshooting ESIE05 03 3 40 Part 3 Troubleshooting 3 1 3 4 5...
Страница 264: ...Additional Checks for Troubleshooting ESIE05 03 3 116 Part 3 Troubleshooting 3 1 3 4 5...
Страница 266: ...ESIE05 03 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Страница 306: ...ESIE05 03 5 2 Part 5 Disassembly and Maintenance 3 1 5...
Страница 320: ...Disassembly and Maintenance Outdoor Units ESIE05 03 5 16 Part 5 Disassembly and Maintenance 3 1 5 5...