Outdoor Unit Functional Concept
ESIE05-03
2–42
Part 2 – Functional Description
3
1
2
4
5
3.3.1
Starting Frequency Control
Outline
The inverter compressor will start up with a limited fixed frequency value for a specified period of time
in order to prevent liquid back to the compressor, and to limit the starting current.
General
The normal starting control time is 2~3 minutes. The maximum starting frequency control time is
limited to 10 minutes.
During compressor start-up, a pressure difference will be build up in order to have sufficient pressure
difference for the 4-way valve to change over.
Graph
Ending condition
The starting control will be terminated when the low pressure value < 6 bar or when the maximum
starting time of 10 minutes has been reached in case the low pressure value stays > 6 bar.
71 class: 73 Hz
100~140-class: 107 Hz
Hz
Step 1
ON
± 1 min
2~3 min
time
Normal control
ESIE05-03.book Page 42 Wednesday, April 6, 2005 4:09 PM
Содержание RZQ100B7W1B
Страница 1: ...Service Manual ESIE05 03 RZQ71 125B8V3B RZQ100 140B7W1B Sky Air Inverter R 410A B series...
Страница 2: ......
Страница 10: ...ESIE05 03 viii Table of Contents 3 1 4 5...
Страница 24: ...ESIE05 03 1 2 Part 1 System Outline 3 1 1 5...
Страница 32: ...General Outline Outdoor Units ESIE05 03 1 10 Part 1 System Outline 3 1 1 4 5...
Страница 42: ...Specifications ESIE05 03 1 20 Part 1 System Outline 3 1 1 4 5...
Страница 56: ...Functional Diagrams ESIE05 03 1 34 Part 1 System Outline 3 1 1 4 5...
Страница 58: ...ESIE05 03 1 36 Part 1 System Outline...
Страница 70: ...Wiring Diagrams ESIE05 03 1 48 Part 1 System Outline 3 1 1 4 5...
Страница 84: ...PCB Layout ESIE05 03 1 62 Part 1 System Outline 3 1 1 4 5...
Страница 86: ...ESIE05 03 2 2 Part 2 Functional Description 3 1 2 5...
Страница 110: ...General Functionality ESIE05 03 2 26 Part 2 Functional Description 3 1 2 4 5...
Страница 150: ...ESIE05 03 3 2 Part 3 Troubleshooting 3 1 3 5...
Страница 188: ...Troubleshooting ESIE05 03 3 40 Part 3 Troubleshooting 3 1 3 4 5...
Страница 264: ...Additional Checks for Troubleshooting ESIE05 03 3 116 Part 3 Troubleshooting 3 1 3 4 5...
Страница 266: ...ESIE05 03 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Страница 306: ...ESIE05 03 5 2 Part 5 Disassembly and Maintenance 3 1 5...
Страница 320: ...Disassembly and Maintenance Outdoor Units ESIE05 03 5 16 Part 5 Disassembly and Maintenance 3 1 5 5...