Field settings
ESIE05-03
4–24
Part 4 – Commissioning and Test Run
3
1
4
5
2.11
Silent Operation
Purpose
Lower the operation sound of the outdoor unit.
Setting
Silent Operation can be activated by:
1
Automatic control (By field setting from remote controller)
2
External activation (from optional PCB KRP58M)
2.11.1 Silent Operation by Automatic control
Table
Silent operation can be set by field setting from the wired remote controller:
Method
When setting mode 16(26)-0-02, silent operation will be carried out by presuming the current time in
accordance with the outside temperature.
Automatic mode will start when the outdoor temperature is = average max of last 10 days -5°C and
will be conducted for 10 hours.
The maximum outdoor temperature is supposed to occur at 14:00h.
As the time judgement is made in accordance with the outdoor temperature, the above mentioned
timing is an estimation only.
Capacity
precedence setting
When setting mode 16(26)-0-04, the low noise operation will be stopped when the heating or cooling
load increases. In that case, the operation will return to normal operation. The unit will return to
low-noise operation when the heating or cooling load decreases again.
Graph
Descrip-
tion
Mode
First
Code
Second Code
01
02
03
04
05
Silent
Operation
16(26)
0
OFF
Low
noise
activation
—
Low
noise +
capacity
priority
—
Low noise
start &
stop time
1
—
—
22h00 ~
06h00
22h00 ~
08h00
20h00 ~
08h00
Maximum
ambient
temperature
+8 hours
Start night
quiet
operation
+10 hours
End night
quiet
operation
Trend line indicating fluctuation of
outdoor ambient temperature in 24
hours.
ESIE05-03.book Page 24 Wednesday, April 6, 2005 4:09 PM
Содержание RZQ100B7W1B
Страница 1: ...Service Manual ESIE05 03 RZQ71 125B8V3B RZQ100 140B7W1B Sky Air Inverter R 410A B series...
Страница 2: ......
Страница 10: ...ESIE05 03 viii Table of Contents 3 1 4 5...
Страница 24: ...ESIE05 03 1 2 Part 1 System Outline 3 1 1 5...
Страница 32: ...General Outline Outdoor Units ESIE05 03 1 10 Part 1 System Outline 3 1 1 4 5...
Страница 42: ...Specifications ESIE05 03 1 20 Part 1 System Outline 3 1 1 4 5...
Страница 56: ...Functional Diagrams ESIE05 03 1 34 Part 1 System Outline 3 1 1 4 5...
Страница 58: ...ESIE05 03 1 36 Part 1 System Outline...
Страница 70: ...Wiring Diagrams ESIE05 03 1 48 Part 1 System Outline 3 1 1 4 5...
Страница 84: ...PCB Layout ESIE05 03 1 62 Part 1 System Outline 3 1 1 4 5...
Страница 86: ...ESIE05 03 2 2 Part 2 Functional Description 3 1 2 5...
Страница 110: ...General Functionality ESIE05 03 2 26 Part 2 Functional Description 3 1 2 4 5...
Страница 150: ...ESIE05 03 3 2 Part 3 Troubleshooting 3 1 3 5...
Страница 188: ...Troubleshooting ESIE05 03 3 40 Part 3 Troubleshooting 3 1 3 4 5...
Страница 264: ...Additional Checks for Troubleshooting ESIE05 03 3 116 Part 3 Troubleshooting 3 1 3 4 5...
Страница 266: ...ESIE05 03 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Страница 306: ...ESIE05 03 5 2 Part 5 Disassembly and Maintenance 3 1 5...
Страница 320: ...Disassembly and Maintenance Outdoor Units ESIE05 03 5 16 Part 5 Disassembly and Maintenance 3 1 5 5...