IOM 1266-2 • MAGNITUDE
®
MODEL WME CHILLERS
12 www.DaikinApplied.com
I
nsTallaTIon
Partial Disassembly Construction - Type B
Compressor(s), power box(es), and control box are removed at the factory and shipped on separate skids; combined vessel stack
is shipped together as a sub-assembly.
Figure 9: Partial Disassembly Construction Option - Representative Schematic
Scope:
• Site reassembly must be supervised or completed
by Daikin Applied service personnel. Cost for unit
reassembly and supervision by Daikin Applied service
is not included in the purchase price of the equipment.
Contact Daikin Applied service for pricing.
• Unit is fully tested at the factory prior to disassembly and
shipment.
• All associated piping and wiring remain attached, if
possible. Suction and discharge lines have bolt-on
flanges and, if possible, remain attached. If the stack size
or weight dictates further disassembly, the vessels can
be separated by disconnecting any interconnecting wiring
and tubing and then unbolting them.
• Refrigerant will not be shipped with the chiller and must
be procured by others. Compressor(s) and vessels
receive an inert gas holding charge that must be released
prior to attempting to open any connection.
• All free piping ends are capped. Blockoffs will cover all
compressor and vessel openings.
• Unit ships with vessel and/or head insulation, if ordered.
• Unit ships with replacement refrigerant gaskets and
O-rings, stick-on wire ties, and touch-up paint.
CAUTION
Standard torque specs must be followed when re-installing
bolts. Contact Daikin Applied service for this information.
WARNING
Remove compressor, piping or vessel holding charge through
the Schrader valve in the blockoff plates before attempting to
loosen any fittings on them. Failure to do so can cause severe
bodily injury.
COMPRESSOR
(x2 FOR DUAL COMPRESSOR MODELS)
* DUAL COMPRESSOR VESSEL BLOCKOFFS SHOWN
FOR REPRESENTATIVE ILLUTRATION - SINGLE
COMPRESSOR MODELS WILL HAVE 1 SET.
VESSEL
BREAKPOINTS
VESSEL
BREAKPOINTS
BLOCKOFF
VESSEL
NOZZLE*
32:(5%2;
5(35(6(17$7,9(6+2:1
(x2 FOR DUAL COMPRESSOR MODELS)
GLUE
INSULATION & OTHER ITEMS
MISCELLANEOUS ITEMS
CRATE 1
Y'03%6"-$0.13&4403.0%&-4
LIQUID INJECTION
CRATE 2
Y'03%6"-$0.13&4403.0%&-4
DISCHARGE PIPING
ROTOR COOLING SUPPLY (3 PCS) & RETURN LINE
STATOR COOLING SUPPLY (2 PCS) & RETURN LINE
SUCTION ELBOW
MAIN LIQUID LINE
LOOSE INSULATION
-*26*%-*/&&&7#0%:
3"/(&&95&/4*0/1*1*/(
GLUE
MISCELLANEOUS ITEMS