Test Operation
SiBE28-804
84
Test Operation
1. Test Operation
1.1
Test Run Checks
1.1.1 Checks before Test Run
Before carrying out a test run, proceed as follows:
1.1.2 Test Run Checks
To carry out a test run, check the following:
Check that the temperature setting of the remote controller is at the lowest level in cooling
mode or use test mode.
Go through the following checklist:
Step
Action
1
Make sure the voltage at the primary side of the safety breaker is:
230 V ± 10% for 1-phase units
400 V ± 10% for 3-phase units
2
Fully open the liquid and the gas stop valve.
Checkpoints
Cautions or warnings
Are all units securely installed?
Dangerous for turning over during
storm.
Possible damage to pipe connections.
Is the earth wire installed according to the applicable
local standard?
Dangerous if electric leakage occurs.
Are all air inlets and outlets of the indoor and outdoor
units unobstructed?
Poor cooling.
Poor heating.
Does the drain flow out smoothly?
Water leakage.
Is piping adequately heat-insulated?
Water leakage.
Have the connections been checked for gas leakage?
Poor cooling.
Poor heating.
Stop.
Is the supply voltage conform to the specifications on the
name plate?
Incorrect operation.
Are the cable sizes as specified and according to local
regulations?
Damage of cables.
Are the remote controller signals received by the unit?
No operation.
Содержание FHQ100BUV1B x 2
Страница 1: ...SiBE28 804 SkyAir RZQ71C7V1B RZQ100 140C7V1B RZQS71 100C7V1B RZQS125 140C7V1B R 410A Heat Pump 50Hz ...
Страница 13: ...SiBE28 804 2 ...
Страница 19: ...Model Name and Power Supply SiBE28 804 8 General Information ...
Страница 29: ...Specifications SiBE28 804 18 Specifications ...
Страница 33: ...Wired Remote Controller SiBE28 804 22 Remote Controller 1 2 Installation ...
Страница 34: ...SiBE28 804 Wired Remote Controller Remote Controller 23 ...
Страница 43: ...SiBE28 804 32 Functional Description 6 Outdoor Unit Fan Speed Control 81 6 1 Outdoor Unit Fan Speed Control 81 ...
Страница 93: ...Outdoor Unit Fan Speed Control SiBE28 804 82 Functional Description ...
Страница 131: ...Test Run and Operation Data SiBE28 804 120 Test Operation ...
Страница 251: ...Troubleshooting by Remote Controller Display LED Display SiBE28 804 240 Troubleshooting ...
Страница 277: ...PCB Layout SiBE28 804 266 Appendix ...
Страница 297: ...RZQ100 140C7 RZQS125 140C7V1B SiBE28 804 286 Removal Procedure ...
Страница 311: ...SiBE28 804 iv Index ...