8
|
Piping installation
Installer reference guide
93
ERGA04~08EAV3(A) + EHBH/X04+08EA/EJ6V+9W
Daikin Altherma 3 R W
4P629085-1 – 2020.08
3
Open the gas stop valve.
If pump down is needed in case of dismantling or relocating the system, see
8.5.6 To fix the fluorinated greenhouse gases label
1
Fill in the label as follows:
b
Contains fluorinated greenhouse gases
2
1
1
1
2
2
kg
tCO
2
eq
GWP × kg
1000
=
=
+
kg
=
kg
=
GWP: XXX
RXXX
a
f
c
d
e
a
If a multilingual fluorinated greenhouse gases label is delivered with the unit (see accessories), peel off the
applicable language and stick it on top of
a
.
b
Factory refrigerant charge: see unit name plate
c
Additional refrigerant amount charged
d
Total refrigerant charge
e
Quantity of fluorinated greenhouse gases
of the total refrigerant charge expressed as tonnes CO
2
equivalent.
f
GWP = Global warming potential
NOTICE
Applicable legislation on
fluorinated greenhouse gases
requires that the refrigerant
charge of the unit is indicated both in weight and CO
2
equivalent.
Formula to calculate the quantity in CO
2
equivalent tonnes:
GWP value of the
refrigerant × total refrigerant charge [in kg] / 1000
Use the GWP value mentioned on the refrigerant charge label.
2
Fix the label on the inside of the outdoor unit near the gas and liquid stop
valves.
8.6 Connecting water piping
8.6.1 About connecting the water piping
Before connecting the water piping
Make sure the outdoor and indoor unit are mounted.
Typical workflow
Connecting the water piping typically consists of the following stages:
1
Connecting the water piping to the indoor unit.
2
Connecting the drain hose to the drain.
3
Filling the water circuit.
4
Filling the domestic hot water tank.
5
Insulating the water piping.
Содержание ERGA04EAV3A
Страница 263: ...11 11...
Страница 264: ...4P629085 1 2020 08 Copyright 2020 Daikin Verantwortung f r Energie und Umwelt...