9
|
Electrical installation
Installer reference guide
120
ERGA04~08EAV3(A) + EHBH/X04+08EA/EJ6V+9W
Daikin Altherma 3 R W
4P629085-1 – 2020.08
In case of low voltage Smart Grid contacts
Wires (Smart Grid pulse meter): 0.5 mm²
Wires (low voltage Smart Grid contacts): 0.5 mm²
[9.8.4]=3 (
Benefit kWh power supply
=
Smart grid
)
[9.8.5]
Smart grid operation mode
[9.8.6]
Allow electrical heaters
[9.8.7]
Enable room buffering
[9.8.8]
Limit setting kw
The wiring of the Smart Grid in case of low voltage contacts is as follows:
14
13
S11S
6
5
S4S
4
3
X5M
S10S
10
9
a
2
1
a
Jumper (factory-mounted). If you also connect a safety thermostat (Q4L), replace the jumper with the
safety thermostat wires.
S4S
Smart Grid pulse meter
1
/S10S
Low voltage Smart Grid contact 1
2
/S11S
Low voltage Smart Grid contact 2
1
Connect the wiring as follows:
B
C
A
A
X5M.4
X5M.3
S4S
X5M.10
X5M.9
S10S
X5M.6
X5M.5
S11S
2
1
C
B
X5M
X5M
3
4
5
6
910
13
14
2
Fix the cables with cable ties to the cable tie mountings.
Содержание ERGA04EAV3A
Страница 263: ...11 11...
Страница 264: ...4P629085 1 2020 08 Copyright 2020 Daikin Verantwortung f r Energie und Umwelt...