9
|
Electrical installation
Installer reference guide
119
EBLA04~E23V3 + EDLA04~E23V3
Daikin Altherma 3 M
4P685228-1A – 2022.05
STEP 1
Smart Grid relay kit installation
STEP 2
Low voltage connections
STEP 3
High voltage connections
1
High voltage Smart Grid contact 1
2
High voltage Smart Grid contact 2
K1A
Relay for Smart Grid contact 1
K2A
Relay for Smart Grid contact 2
a, b
Coil sides of relays
c, d
Contact sides of relays
e
Jumper (factory-mounted). If you also connect a safety thermostat (Q4L), replace
the jumper with the safety thermostat wires.
S4S
Smart Grid pulse meter (optional)
1
Install the components of the Smart Grid relay kit as follows:
a
b
c
d
e
K1A
K2A
X10M
×2
×4
K1A
Relay for Smart Grid contact 1
K2A
Relay for Smart Grid contact 2
X10M
Terminal block
a
Screws for X10M
b
Screws for K1A and K2A
c
Sticker to put on the high voltage wires
d
Wires between the relays and X5M (AWG22 ORG)
e
Wires between the relays and X10M (AWG18 RED)
X5M
5 6 9
10
K2A
K1A
X10M
a
b
b
b
1 2 3 4
2
Connect the low voltage wiring as follows:
X5M.4
X5M.3
S4S
S4S
Smart Grid pulse meter (optional)
Содержание EBLA04E2V3
Страница 280: ...14 14 ...
Страница 281: ......
Страница 282: ......
Страница 283: ......
Страница 284: ...4P685228 1A 2022 05 Copyright 2022 Daikin Verantwortung für Energie und Umwelt ...