iom-clic-cf-eng
www.clima-flex.com
109
!
WARNING
!
The installer must take these procedures into account; his
personnel must be qualified and certified to perform the in-
stallation in order to comply with all specifications and good
practices to ensure proper operation of the unit.
PRE-START-UP CHECKLIST
Date:
Place of Work:
Location:
Installing Contractor:
Technician/Company:
Unit Commissioning:
Unit model:
Serial number:
The following data should be checked before putting the unit into
operation.
PHYSICAL
INSPECTION
(BEFORE
ELECTRICAL CONNECTION)
Check that the unit has not been damaged by
handling or transport.
Visually check for refrigerant leaks.
Open the unit for hydraulic installation only. Do not
remove the connection guards until the hydraulic
circuit is closed.
Check for foreign objects in the fan discharge.
Check that the air inlet is not obstructed and has
the suggested clearance.
INSPECTION OF THE HYDRAULIC CIRCUIT
Date:
Place of Work:
Location:
Installing Contractor:
Technician/Company:
Unit Commissioning:
Unit model:
Serial number:
It is necessary to install a water filter in all hydraulic circuits to
prevent the entry of solid particles, these must be installed on
the return side of the circuit and must be cleaned once the initial
system load is finished.
Check that the water filter is clean.
Check that all service valves are open.
Check the correct structure of the water supply.
Check that all pipes are filled with water and that air
has been evacuated.
Check thermometers (not included from factory).
Check the pressure gauges (not included in the
delivery).
NOTE:
Accessories such as thermometers, pressure
gauges, measuring ports, etc.,
Are recommended
but not necessary for the operation of the unit
!
WARNING
!
If the hydraulic circuit contains air, it may compromise the
operation of the unit.
Startup and Shutdown Procedures
CHECKING THE ELECTRICAL SUPPLY
The units require grounded, three-phase electrical power.
Verify that the circuit breaker is of the correct rating
for the unit.
Check that all electrical connections are secure.
Check for false ground contacts as well as all wiring.
Check internal control and power connections.
Measure voltage on all units, ground, neutral and
3-phase line.
Check that the motor overload protection conforms
to design requirements and is in automatic mode.
Check voltage (*Motor save), which is set to supply
the correct supply voltage for the unit.
NOTE:
The equipment should be energized 24 hours
prior to start-up in order to warm up the
compressor crankcase before starting the unit.
the compressor crankcase before starting the unit.
!
WARNING
!
If the equipment has not been energized for the indicated
time, do not proceed with the start-up as this may cause
damage to the equipment.
Note:
The control panel of each of the equipment
has a duct, placed solely and exclusively
for forced ventilation of the equipment.
It must not be obstructed for any reason.
Содержание Clima-Flex CLIC Series
Страница 23: ...iom clic cf eng www clima flex com 23 Dimensions Packaged Units Figure 14 Dimensional configuration 50 RT...
Страница 24: ...iom clic cf eng www clima flex com 24 Dimensions Packaged Units Figure 15 Dimensional configuration 75 RT...
Страница 25: ...iom clic cf eng www clima flex com 25 Dimensions Packaged Units Figure 16 Dimensional configuration 100 RT...
Страница 26: ...iom clic cf eng www clima flex com 26 Dimensions Packaged Units Figure 17 Dimensional configuration 125 RT...
Страница 27: ...iom clic cf eng www clima flex com 27 Dimensions Packaged Units Figure 18 Dimensional configuration 150 RT...
Страница 28: ...iom clic cf eng www clima flex com 28 Dimensions Packaged Units Figure 19 Dimensional configuration 175 RT...
Страница 29: ...iom clic cf eng www clima flex com 29 Dimensions Packaged Units Figure 20 Dimensional configuration 200 RT...
Страница 30: ...iom clic cf eng www clima flex com 30 Dimensions Packaged Units Figure 21 Dimensional configuration 250 RT...
Страница 31: ...iom clic cf eng www clima flex com 31 Dimensions Packaged Units Figure 22 Dimensional configuration 250 RT...
Страница 39: ...iom clic cf eng www clima flex com 39 Electrical Data...
Страница 41: ...iom clic cf eng www clima flex com 41 Electrical Data...
Страница 43: ...iom clic cf eng www clima flex com 43 Electrical Data...
Страница 45: ...iom clic cf eng www clima flex com 45 Electrical Data...
Страница 46: ...iom clic cf eng www clima flex com 46 Electrical Data...
Страница 48: ...iom clic cf eng www clima flex com 48 Electrical Data...
Страница 53: ...iom clic cf eng www clima flex com 53 R454B Electrical Data Figure 38 RS485 communication...
Страница 57: ...iom clic cf eng www clima flex com 57 R454B Electrical Data Figure 44 Fan controller gas leakage sensor...
Страница 77: ...iom clic cf eng www clima flex com 77 Clic R454b Unit This unit use the R454B Refrigerant...
Страница 117: ...iom clic cf eng www clima flex com 117 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 118: ...iom clic cf eng www clima flex com...