Check, Test & Start Procedure For:
Daikin Applied Unit Ventilators
Il . Controls check
A. Does the unit have Daikin controls (MicroTech)? .......................................................................................... Yes
No
lf No, control company _____________________________________________________________________________________
If controls are not by Daikin, skip to Section III.
B. Condensate disposal system operating O.K. (drainIess AED)? .................................................................... Yes
No
C. Does unit start and perform per sequence of operation as stated in OM? .................................................... Yes
No
D. If the unit has a unit mounted sensor, has the insulation been
removed from the sampling chamber inlet? .................................................................................................. Yes
No
E. Are all sensors installed and insulated properly? .......................................................................................... Yes
No
F. If the unit has MicroTech controls, room setpoint: _______°F Deadband 6° or _______°F
III . Refrigeration system
A. Has all field piping been leak tested to 100 psig (AVS, AVV, AVR, AHF, AHV & AHR)
.................................. Yes
No
B. Is expansion valve bulb properly installed and insulated ............................................................................... Yes
No
C. High pressure control cutout (if applicable) _________ psig
D. Crankcase heater operating O.K.? ................................................................................................................ Yes
No
E. Reversing valve operating O.K.? .................................................................................................................. Yes
No
F. Emergency heat operating O.K.? ................................................................................................................. Yes
No
G. Piping correct (AVS, AVV, AVR, AHF, AHV & AHR to remote condensing unit)? .......................................... Yes
No
H. Checked for refrigerant leaks? ..................................................................................................................... Yes
No
IV . Hydronic piping check
A. Is unit piping correct
(the remainder of this section applies only to units with Daikin controls)
? ................................. Yes
No
B. Is the modulating control valve(s) piped correctly (valve controlled units)? .................................................. Yes
No
C. Is the modulating control valve(s) placed in the upright position (valve controlled units)? ............................ Yes
No
D. Is 2 - position control valve(s) piped correctly (face and bypass)? ................................................................ Yes
No
© 2016 Daikin Applied • www.DaikinApplied.com • (800) 432–1342