www.DaikinApplied.com
9
IM 817-7
Louver Installation With Typical Unit
Configurations (continued)
Unit Configuration Type AN
Note:
Arrangement AB with full metal back panel, similar to
configuration type AN. (Outside air opening to be cut and
sealed by others.)
Figure 13: 21-7/8" (556mm) Deep Full Adapter Back Unit
With Standard Louver Application
Louver
Piping
Important:
Gasket sealing
surface is required.
Lintel
(By Others)
Piping
Floor Line
1"
(25mm)
Sealed Cement
Mortar; Pitch Away
From Unit
Figure 14: 21-7/8" (556mm) Deep Full Adapter Back Unit
with High Louver Application
Not More
Than
28"(711mm)
Sealed Cement
Mortar; Pitch Away
From Unit
Important:
Gasket sealing surface is required.
Louver
Lintel (By Others)
Piping
Piping
Floor Line
Unit Configuration Type AP
Figure 15:
The 21-7/8″ (556mm) Deep Full Adapter Back
Unit with Closed Pipe Tunnel, Ducted with Top Intake
Important:
Gasket sealing surface is required.
Intake Louver
Piping
Piping
Window Sash
“Goose Neck” Insulated Duct
(By Others)
Duct Collar (By Daikin)
Floor Line
Unit Configuration Type AK
Figure 16: 21-7/8" (556mm) Deep Partial Adapter Back Unit
with Open Pipe Tunnel
Piping
Piping
Floor Line
Lintel (By Others)
Intake Louver
Not More
Than 12"
Important: Gasket sealing surface
is required.
1"
Sealed Cement
Mortar; Pitch Away
From Unit