8
|
Piping installation
Installer reference guide
108
08CA + EHY EHYHBH/X08A + EHYKOMB33AA
Daikin Altherma hybrid heat pump
4P355634-1G – 2022.09
In case of EHYHBX
0.0 mm
a
a
Drain pan kit
8.7 Connecting the gas piping
8.7.1 To connect the gas pipe
1
Connect a gas valve to the 15 mm gas connection of the gas boiler and
connect it to the field pipe according to local regulations.
2
Install a gas mesh filter in the gas connection if the gas may be contaminated.
3
Connect the gas boiler to the gas supply.
4
Check all parts for gas leaks on a pressure of maximum 50 mbar
(500 mm H
2
O). There may be no stress on the gas supply connection.
8.7.2 To perform an air purge on the gas supply
1
Turn once the screw counterclockwise.
Содержание Altherma EHYHBH05A Series
Страница 261: ......
Страница 262: ......
Страница 263: ......
Страница 264: ...4P355634 1G 2022 09 Copyright 2013 Daikin Verantwortung f r Energie und Umwelt...