4
Set-up and installation
Installation and maintenance instructions
15
Daikin Altherma EHS(X/H)(B)-D
Heat pump (indoor unit) with integrated heat accumulator
008.1444099_01 – 11/2018 – EN
5
Install the indoor unit at the installation site.
▪ When setting up the unit in a cabinet, behind panels or in other
restricted conditions, ensure sufficient ventilation (e.g. using
ventilation gratings). If the total refrigerant charge in the system
is ≥ 1.84 kg, further requirements of the ventilation openings
must be met (see
Chap. 10.5
).
4.4
Preparing the device for
installation
4.4.1
Remove the front screen
1
Undo the screws (1.).
2
Press the lateral holding burls upwards with your fingers (2.),
stem from above with the thumbs.
3
Remove the front screen to the front (3.).
Fig. 4-7
Remove the front screen
4
After completing the installation
: Place the front screen
straight directly above the rotary switch of the RoCon+ HP.
Press on the top and bottom until the front screen is securely en-
gaged again.
4.4.2
Remove the protective cover
1
Undo the screws (1.).
2
Unhook the protective cover from the rearward facing holding
burls (2.), lift at the back (3.) and remove to the front (4.).
Fig. 4-8
Remove the protective cover
Fig. 4-9
Without protective cover
4.4.3
Moving the controller housing to the
service position
To facilitate work on the hydraulics of the indoor unit, the control box
can be moved to the service position.
1
Loosen the screws (1) of the holder of the controller housing.