Set-up and installation
Installation and maintenance instructions
14
Daikin Altherma EHS(X/H)(B)-D
Heat pump (indoor unit) with integrated heat accumulator
008.1444099_01 – 11/2018 – EN
Installation area
▪ The base must be level and smooth and have a sufficient
ground
load-bearing capacity
of
1050 kg/m²
plus safety factor. Install a
pedestal if necessary.
▪ Observe the installation dimensions (see
Chap. 4.1
).
Minimum distance
DANGER: RISK OF BURNING
The plastic wall of the storage tank on the indoor unit can
melt under the effects of external heat (>80 °C) and, in the
extreme case, can catch fire.
▪ Only install the indoor unit at a minimum clearance of
1 m from other heat sources (>80 °C) (e.g. electrical
heater, oil heater, chimney) and combustible material.
CAUTION
If the indoor unit is not installed at a
sufficient
dis-
tance
below
the flat solar panels (the top edge of the stor-
age tank is higher than the bottom edge of the solar pan-
els), the unpressurised solar system in the outdoor area
will not be able to drain completely.
▪ When a solar connection is used, install the indoor unit
low enough under the flat solar panels (observe the min-
imum gradient of the solar connection lines).
Recommended minimum distances
:
To the wall: (back) ≥ 100 mm, (sides) ≥ 500 mm
To the ceiling: ≥ 1200 mm, at least 480 mm.
Distances from the outdoor unit:
When selecting the installation location, the information in the table
Tab. 4-3
must be taken into account.
Maximum refrigerant line length between the indoor
and outdoor unit
30 m
Minimum refrigerant line length between the indoor
and outdoor unit
3 m
Maximum height difference between the indoor and
outdoor unit
20 m
Tab. 4-3
4.3.2
Installing the device
WARNING
When unfilled, the indoor unit is top-heavy and could tip
over during transport. That could put persons in danger or
damage the unit.
▪ Secure the indoor unit well, transport carefully, use the
handles.
Precondition
▪ The installation site complies with applicable country-specific reg-
ulations and meets the minimum requirements described in
Chap. 4.3.1
.
Installation
Fig. 4-6
Installing the handles
Item
Designation
A
Handle
B
cover panel
F
Threaded piece
Tab. 4-4
1
Remove packing and dispose of it in an environment-friendly
manner.
2
Pull off the cover screens from the storage tank (
Fig. 4-6
, item B)
and unscrew the threaded fittings (
Fig. 4-6
, item F) from the
openings at which the handles are to be fitted.
3
Screw the handles (
Fig. 4-6
, item A) into the now uncovered
threaded holes.
4
Carefully transport the indoor unit to the installation site, use the
handles
.