Use and maintenance instructions
Electric submersible pumps for sewage
5.2.1 MOBILE INSTALLATION
(fig. 5)
Delivery pipe must have diameter not inferior to the pump inlet.
When using a flexible pipe , it is advisable a reinforced pipe with
metallic spiral which maintains the section unchanged even in
presence of bends.
The eventual foot valve and gate valve must be assembled at a
distance of approx 50 ÷ 200 cm. in a section of metallic pipe (rigid).
Special attention should be paid to the positioning of electric cables
in order to avoid possible bending, pressing, lifting and that the
same are accidentaly sucked by the pump.
When the pump is installed on the bottom of the pit relevant rope
or chain must be anchored to one side of the upper part of pit;
when the pump is suspended the rope or chain must guarantee the
perfect support of the electric pump together with relevant delivery pipe considering also the dynamic reactions
when starting and functioning.
5.2.2 FIXED INSTALLATION WITH COUPLING TO FOOT PEDESTAL (fig. 6)
For the installation of foot pedestal and electric pump proceed as
follows:
- Fix the upper bracket for the guide pipes (fig. 7 – pos. A ) to the
edge of the pit
- Locate at bottom of pit the foot pedestal for the automatic coupling
(fig. 7 – pos. B) and check that the guide pipe conical fixations are
perfectly perpendicolar and leveled to the correspondent fixations
of the upper bracket located to the edge of the pit.
- Take the exact length of the guide pipes (fig. 7 – pos. C)
- Fix firmly the pedestal foot to the bottom of pit with suitable anchor
clamps or metallic blocks.
- Connect the delivery pipe to the foot pedestal outlet
- Disassemble the upper brackets from the edge of the pit and
insert in the conical fixations of the foot pedestal the guide pipes
previously cutted of correct length and fix them to the brackets
reassembling the same to the edge of the pit.
- Assemble the special skid-flange (fig. 7 – pos. D) on the delivery outlet of the pump and hook the rope or
chain to the handle or slot located on the upper part of it.
- Lift the electric pump up to over the pit and let it slowly descend guiding the skid-flange in the guide pipes.
- The hook of lifting rope or chain must be in line with the center of gravity of pump.
- Secure the extremities of rope or chain to the upper bracket located at the edge of the pit.
- Dispose the electric cables avoiding bends and deflections and paying attention that relevant terminals are
not in contact with water.
1 Electric submersible pump
2 Lifting chain
3 Floating switch / probes
4 Electric cable
5 Electric panel
6 Non return valve
7 Gate valve
8 Pit
9 Supplementary pit with grid (optional)
10 Delivery pipe
11 Decantation area
12 Foot pedestal
A device must be provided for cutting off and isolating the power supply.
Fig. 5
Fig. 6
Fig. 7
Foot pedestal
D
C
B
A
Содержание GRINDER GL
Страница 2: ......
Страница 4: ......
Страница 21: ...Note...
Страница 22: ......
Страница 39: ...Notes...
Страница 40: ......
Страница 57: ...Notes...
Страница 58: ......
Страница 75: ...Notizen...
Страница 76: ......
Страница 93: ...Notas...
Страница 94: ......
Страница 111: ...Notities...
Страница 112: ......
Страница 114: ...114 RU 1 1 1 1 2 2 1 2 2 Type Serial N Pn kW V Q A Cos H Ins CL IP IEC529 IP68 EN60034 5 RPM Hz F kg Year 1...
Страница 115: ...115 RU i EN 60335 1 02 I 70 3 3 1 6 11 2 1 Dab Pumps 40 C 104 F 8 FEKA GRINDER...
Страница 117: ...117 RU 4 4 1 125 127 10 4 2 5 5 1 3 2...
Страница 118: ...118 RU 5 2 6 5 2 1 5 50 200 5 2 3 3 4...
Страница 119: ...119 RU 5 2 2 6 7 7 7 C 7 D 1 2 3 4 5 6 7 8 9 10 11 12 5 3 IDN 30 7 D C B A 6...
Страница 122: ...122 RU 13 14 6 6 1 10 6 2 7 7 1...
Страница 123: ...123 RU 4000 8000 500 5 2 7 2 S 1 2 3 n 4 8 9 PPOM...
Страница 126: ...126 RU 10 1 A B C D E E C B A D DRENAG 500 900 DRENAG 1600 3000 FEKA GL DIG 1100 2200 DIG 3700 11000...
Страница 129: ......
Страница 130: ......
Страница 147: ...Anota es...
Страница 148: ......
Страница 150: ...GR 150 1 1 1 1 2 2 1 2 2 Type Serial N Pn kW V Q A Cos H Ins CL IP IEC529 IP 68 EN60034 5 RPM Hz F kg Year 1...
Страница 152: ...GR 152 20 m 2 3 GRINDER GRINDER GL 30 FEKA FEKA RC 20 5 5 15 5 5 DRENAG DIG 30 10 50Hz 60Hz 5 3 3 4 4 1 161 163...
Страница 153: ...153 GR 10 4 2 5 5 1 3 2 5 2 6...
Страница 154: ...GR 154 5 2 1 5 50 200 cm 5 2 2 6 7 A 7 B 7 C 5 2 3 3 4...
Страница 155: ...155 GR 7 D 1 2 3 4 5 6 7 8 9 10 11 12 5 3 IDN 30 mA 3 6 7 D C B A...
Страница 158: ...GR 158 6 6 1 5 6 2 7 7 1 4000 8000 500V 5MW 2MW...
Страница 159: ...159 GR 7 2 Dab Pumps 1 2 3 4 8 Dab Pumps 9 PPOM...
Страница 162: ...GR 162 10 1 A B C D E E C B A D DRENAG 500 900 DRENAG 1600 3000 FEKA GL DIG 1100 2200 DIG 3700 11000...
Страница 165: ......
Страница 166: ......
Страница 183: ...Note...
Страница 184: ......
Страница 201: ...Notlar...
Страница 202: ......
Страница 219: ...Pozn mky...
Страница 220: ......
Страница 237: ...Uwagi...
Страница 238: ......
Страница 255: ...Anm rkningar...
Страница 256: ......
Страница 273: ...Huomautuksia...
Страница 274: ......
Страница 291: ...291 K zi haszn lati s karbantart si Magyar Mer l szennyv z s csapad kv z szivatty khoz HU Notes...